Tower C. Resume –

Work Experiences Summary

15 years of experience in Oil and Gas and Construction

Multidiscipline Estimator/Quantity Surveyor – Civils, Structural, Mechanical, Electrical, Instrumentation and Piping

Project Control Specialist

Computer Skills

Microsoft Word, Excel, Power Point

Primavera P6

Navish Works, AutoCAD and Micro Station

Summary Work Experience

Quantity take off and Cost Estimates of Direct, Material and Equipment for Electrical systems such as Installation Cables, Terminations, Power, Lighting, Electrical Equipment, Electrical Heat Tracing, Cathodic Protection, Grounding, Telecom, Fire Alarms, CCTV and Speaker Systems, including Testing, as per Design/IFC Drawings, Scope of Work, Schedule of Rates and Definition/Method of Measurement.

Quantity take off and Cost Estimates for Piping Systems related to installation of Pipe, Fittings, SP Fittings, Valves, Bolted Joints, Welds and insulation of Pipes and Fittings if applicable, including all types of Testing related to Piping, as per Design/IFC Drawings, Scope of Work, Schedule of Rates and Definition/Method of Measurement.

Quantity take off and Cost Estimates related to Civil, Structural & Architectural systems as per Design/IFC Drawings, Scope of Work, Schedule of Rates and Definition/Method of Measurement.

Provide support to Lead Estimator producing pricing attachments for bid documents to Contractors.

Perform Bid analysis and produce commercial reports to client.

Provide support to Planning and Scheduling developing Detailed Activities, WBS and Resources as per Detailed Cost Estimates Data.

Develop Benchmarking for future purposes.

Project Highlights

MINING – Cobalt and Nickel Electrowinning Plant – VALE – Client Side – Time and Material Contract Newfoundland Canada

OIL & GAS – CNRL Project – Vacuum Distillation and Diluent Recovery Plant – Tecnicas Reunidas (TR) Canada – EPC side – Lump Sum Contract – Alberta, Canada

OIL & GAS – Shell Carmon Creek Project – Cogeneration 3 x 205 MW Gas Turbine, Central Processing Plant, Field Facilities & Infrastructure Pipelines and Well-Pad Facilities – Rider Hunt International – Client Side – FID Estimate – Alberta, Canada

TAILINGS MANAGEMENT – Imperial Oil ATM Project – Rider Hunt International – Client Side – Combination of Lump Sum and Unit Rates Contract – Alberta, Canada

OIL & GAS – Imperial Oil, Kearl Oilsands Utilities and Offsite Areas – Kentz Canada – Subcontractor – Unit Rate Contract – Alberta, Canada

LNG PROCESSING PLANT – RAS GAS (Qatar Petroleum and Exxon Mobile), LNG Train 6 & 7 and Al-Khaleed (AKG-2) LNG – LNG Processing Plant – Chiyoda and Technip Joint Venture (CTJV) – EPC side – Combination of Lump Sum and Unit Rates Contract – RLIC, Qatar

OIL & GAS – CNRL Project, VDU & DRU Phase 1 – Technip Italy – EPC Side – Lump Sum Contract, Alberta Canada

POWER STATION – CLP (China Light & Power), Penny’s Bay and Black Point Power Station – Client Side – – Hong Kong, China

TRANSIT TRAIN SUBSTATION – KCRC. Nam Cheong Substation – WSP Asia – Engineering – Hong Kong, China

COMMERCIAL, HIGH RISE & RESIDENTIAL BUILDING PROJECTS – Energy Management Systems Inc. – Construction – Manila, Philippines

Education

Bachelor of Science in Electrical Engineering

Central Philippine University

March 1993

Organizations

Registered Electrical Engineer – Philippines

Registered Master Electrician – Philippines

AACE Member

REFERENCES

To be provided as per request.

RIDER HUNT INTERNATIONAL LIMITED

Rider Hunt International Limited Registered in England & Wales No 2305615 Registered Office 32 Queens Road Reading RG1 4BA
ABERDEEN GUILDFORD HOUSTON KUALA LUMPUR LONDON

LONDON ● HOUSTON ● GUILDFORD ● ABERDEEN ● KUALA LUMPUR ● CALGARY

Rider Hunt International Limited Registered in London No 2305615 Registered Office 32 Queens Road Reading RG1 4BA

Last Resume Update February 15, 2017
E-mail lock Locked
Phone Number lock Locked
Resume File lock locked

Contact Candidate

Login or purchase this resume contact details.