Installer of microwave radio dish antenna , bracket and feeders
Repair circuit board and control troubleshooting
Tower climber and installer
GSM equipment installer
DC power and solar equipment termination
Testing and commissioning of transmission radio
RF engineering and design
Terminate cable cat 5e and cat 6
Path loss survey and feasibilities
Antenna system propagation
Site facilities and acquisition
Excellent personnel management and customer interaction skills
Experienced in supervision and project management
Project implementation standard
Flexible to work under aggressive planning tools
Good verbal and communication skills
Work History
Field Technician 03/2016-Present
Triage-Partners LLC/AWN-1715 NW Shore Blvd. Tampa, Florida USA
Install wireless internet ACCESS Point RUKUS dual band
NETGEAR Prosafe 24 port 10/100 PoE Smart Switch with 4 Gigabit.
Lay-out/pulling and of cables
Cat5e/Cat6 and connector termination
Operation Manager 05/2010- 03/2015
AGJ& A LABOR CONTRACTOR AND ALLIED SERVICES-(Trucking)-Davao City, Philippines
Legalization business permits preparation
Perform sales and evaluate the company for long term agreement
Equipment Operation and maintenance monitoring
Budget and equipment expense as require for travel or in the office as well
Conduct training of personnel to develop skills in there respective work and assignment
Coordinate the customer for collection process
Tester/Installer 04/2007-11/2007
Saudi Ericsson Communication Company LTD- P.O. Box 9903 Riyadh 11423, Kingdom of Saudi Arabia
GSM Cellsite indoor/outdoor installation based on the site installation document procedure.
Microwave radio and RBS configuration (IDB installation) based on engineering design.
RF feeder and antenna sweep test (VSWR,RL and DTF) test.
Perform 2Mb's software traffic routing between NPU,MMU & LTU in the traffic node.
Perform RBS cabinet transceiver unit ( TRU) expansion and upgrade system.
Site as-built and red line survey.
Perform installation of Ericsson equipment ,High capacity microwave radio,
minilink TN radio in 2P,6P & 20P AMM,RBS 220,2206,2302,2308.
Operation and maintenance technician 02/2006-01/2007
Mashael Al Rowad Co. LTD. (MARCO)- P.O. Box 446 Riyadh 11352, Kingdom of Saudi Arabia
Huawei CDMA2000 lX, EV-DO Wireless Local Loop WLL project, 3rd Generation.
Maintain RAC 6610 (BSC)base station controller down to (BTS) base transceiver station.
Perform downloading and uploading software and version of the system.
Solve and troubleshoot the issue as soon as possible at the shortest path to avoid system outage.
Maintain E1 interconnection V5.2,Abis interface BSC and far end BTS.
Daily, weekly and monthly test report status, stability and reliability of the system.
Knowleadge in BSC and BTS data configuration and subscriber provissioning.
Field Engineer/Technician 06/2003-03/2005
SR Telecom, Inc. TSB project-Door 2 Marasigan compound RT Lim st. Pagadian City, Philippines
Reworked backbone and repeater microwave radio SR500 links.
Change rf module and parameters and system isolator.
Replaced antenna system and feeders
Testing and commissioning microwave links according to the standard
Perform (PAT) Preliminary Acceptance Test and (SAT) Site Acceptance Test
Networks troubleshooting
Provided proper test document and hand over after the commissioning to the management.
Installer Team Leader 04/2000-02/2003
SR Telecom Inc. TEP 6 project WLL- P.O. Box 295089,Riyadh 11351, Kingdom of Saudi Arabia
Installation SR500s Multi Access digital radio system Central equipment, point to multipoint network
Installation of microwave links point to point and multi point, using 0.3m to 3.7m solid or grip pack
dish antenna, feeders or cable waveguide using 1/2, 7/8, 1'5/8 and connector splicing.
Panning of antenna according to engineering design and calculated levels, with spectrum analyzer
Contineous quality BER test from central station and downstream equipment.
Responsible for the materials and equipment installed, inventories and documentation..
Field Supervisor 01/1999-02/2000
LUCENT Technology Bell Labs TEP-6 Project WLL -Al Hassan Bin Ali st. Jeddah 21432,Kingdom of Saudi Arabia
Responsible for installation of CATU-Central Access Transcoding Unit and CTRU-Central Tranceiver
unit including NIU-Network Interface Unit for wireless local loop.
Coordinate with the installer team in the field of multi sites to prepare job orders, moves and changes.
Monitor the team the quantity and quality of installed equipment
Signal cheked end user premisses evaluation and propagate
Daily reporting and hand over of document finished and unfinished job order.
Provided technical and training the installer regarding equipment installation procedures.
Atleast 25% of 75,000 lines shared and installed by my team in (1) one year time in western region
Saudi Arabia.
Telecom technician 04/1996-04/1998
Cooperative Co. for Communication System- P.O.Box 487 Riyadh 11411 Kingdom of Saudi Arabia
Installation of E1/T1 Cylink microwave links and hubs.
Planning and survey path loss feasibility and evaluate the site facilities.
Solar power system and setup battery backup and controller at repeater site and hubs.
Configured multiflexer such as AWA Plessy, RAD, Scitec and Airbridge.
Performed cross-connected VF/E1 signal cable from swith to mux.
Tower installer and climber.
Education
BS in Electronics and Communication Engineering 06/1984-03/1989
MATS College of Technology- R. Castillo st. Agdao, Davao City, Philippines
Electronics and Service Technician 06/1982-03/1984
| Last Resume Update | August 22, 2016 |
| Address | Poulsbo |
Locked | |
| Phone Number | Locked |
| Resume File | Aagabon-resume.doc.docx 24.79 kB |
| Spanish Speaking? | No |
| Willing to Relocate? | Yes |
| Years Experience | More than 10 years |

Locked