Construction manager

Construction Manager II
T Mobile 700 builds out.Duties would be site visits, managing the builds from start to finish. Accept or Deny close out packages, work close with GC, pre walks to confirm BOM, Post walks to quality check.
Tools used: LDO cam, Site handler, Ericsson portal.
October 2013 – August 2014
Westower Communications – Denver, CO
Construction manager
Worked the RMR project for AT&T.
Worked PMW Sprint / iDen project
Marked assigned to work would be Montana, Wyoming, and Colorado.
Duties would be site visits, managing the builds from start to finish. As well as keeping up with paper work and closeout for site. Building Bom, scoping, redlining, true up, ECT. Extra access given would be webase and Siterra, for every day job function.
Supervising in house crews as well as General contractors performing LTE installs as well as UMTS upgrade.
Training: RF, Rigging, Comm train, Ask your self.
November 2012 to September 2013
General Dynamics, Contractor – Denver, Co
Construction Manager
As a Supervisor for Sprint, I reviewed drawings, red lined, as built, followed up on crews in the field. Checked crews for CPR, Com Train, Safety, Proper sign present, Made sure all proper gear was on site, such as fire extinguisher, rescue gear ECT
Was quick to be asked to be manager, duties would include, managing 86 sites, overseeing the duties of 2 supervisor, ensuring equipment ready for pick up with the GC, Ensuring proper equipment ordered, CD correct and given to GC, Any extra funding GC may need for site taken care of. Jobs started in orderly manner, finished in one as well, maintained close out pic, documents all for pay point. Performed site audits with a% E vendor. Trouble shoot canister site. Reviewed resume for hire, Worked as a team member with other CM
March 2010 to November 2012
Fountain Fire Department – Fountain, CO
Fire fighter / EMT
Duties would include, fire suppression, station maintenance, continued training, Extra duties would include the wild land team, Rescue team, continued certifications in high angle rescue, SWR, Body recover Certified Diver.
Was an active member in the Hammond fire as well as the high country near Fort Collins.
May 2006 to November 2012
ZIZA Foundation – Fort Collins, CO & San Antonio, TX
Owner
After much consideration family relocated the business to Colorado shutting down the Texas region.
ZIZA Foundation is the basis of our family company.
We work for several financial institutions.
They give us orders to secure and maintain property that they own throughout the U.S.
Managed several General contractors, took bids, site surveys.
Book keeping, Spreadsheets, Ordering supplies,

October 2004 to August 2009
Blanco Fire Department – Blanco, TX
Fire fighter – Captain
Duties would include, fire suppression, station maintenance, continued training, Programming base station as well as portable radio from the department ensuring communication stays up.
April 2006 to May 2008
West Tower - San Antonio, TX
Field Construction Foreman
Full turnkey of cell sites in the south Texas corridor.
Operations would include: Re Mods, Antenna swap outs, assembly/Erection of tower structures, Dressing out once built.
Other Duties to include: Microwave deployment, Sweeping, close out packages.
October 2005 to April 2006
Momentum Online - Blanco, Texas
Field Technician
Travel throughout the hill country surveying potential residence as well as commercial clients for local wireless DSL Internet service.
Once approved would look over the facility for best installation ideas.
On customers approval would return for the full installation.
January 2001 to October 2005
CCI (Contempory Constructors Inc.) - San Antonio, TX
Field Construction Foreman
ISI division
Managed a crew of 9 operations to include sight set up, full turnkey operations on microwave links, and continued education on certifications in coax cable, elliptical.
Through continue training was able to received company certifications for the following operations.
Hydro winch, Boom truck operations, Anritzu testing system, comm training,
CDL licensed to help company in relocating equipment.
Inside shelter duties would include mounting racks, setting up batteries terminals, radio configurations, hooking up back haul links.
On occasion would be sent out to represent company on sight surveys.
November 2000 to January 2001
Krause Construction - Spring Branch, TX
Operator
Heavy equipment operator for construction of dams, and roads. Part of a cell site construction. Main operations would include running, blade, and scrapper, D3, D9.
August 1994 to November 2000
CCI (Contempory Constructors Inc.) - San Antonio, TX
Tower Hand
Job Duties consisted of assembly of mounts, antennas, and towers. Towers to include self-support, guide, and monopole. Assembly to erecting tower. Rigging tours, Installation of Antennas, lines, jumpers, connectors, grounds.
Performed several full turnkey microwave hopes.
Traveled U.S as well as outside the U.S to perform some of these services.
Equipment Operations: Cathead, skid loader, backhoe, boom truck, crane
January 1993 to August 1994
NACOM - San Antonio, TX
Installation Technician
Travel throughout Texas and Oklahoma to install twisted wire and fiber optic telephone and data cables in office buildings.
Following wiring diagrams blueprints and ensures accuracy of cable and junction box layout.
Testing all units to ensure a passing grade.
Education:
Lubbock Christian University - Lubbock, Texas
Completed 20 semester hours of undergraduate course work toward a Bachelors degree
University of Maryland - Heidelberg, Germany
Completed 10 semester hours of undergraduate course work toward a Bachelors degree
U.S. Department of Defense Heidelberg High School - Heidelberg, Germany

Last Resume Update November 9, 2015
Address fountain
E-mail lock Locked
Phone Number lock Locked
Resume File Kinikin_Resume-word.docx 505.48 kB
Spanish Speaking? No
Willing to Relocate? Yes
Years Experience 20 +

Contact Candidate

Login or purchase this resume contact details.