
•3 TROUBLESHOOT AND TESTIG FOR THE SITE
•4 PROJECT TEAM LEAD OF 4 PEOPLE
•5 CLOSE OUT PACKAGE FOR SPRINT
08/12 -12/13 THE AIM GROUP NEW MEXICO : TOWER FOREMAN
•1 INSTALLATION OF LTE CABINET’S FOR AT&T
•2 RAN FIBER AND POWER CABLE’S FOR LTE SITE’
•3 PROJECT LEAD FOR LTE TIGER TEAM FOR AT&T
•4 TROUBLESHOOTING AND REPAIRING OF AT&T LTE SITE’S
•5 Built OVER 500 LTE SITE’S .
02/12- 8/12 ASTRON TELECOM OMAHA NEBRASKA : TOWER FOREMAN
•1 RAN FIBER CABLE’S AND ANTENNAS FOR SPRINT LTE
•2 INSTALATION OF RRU 850 AND 1900 RADIO’S ON SPRINT SITE’S
•3 MARKET FOREMEN FOR SPRINT LTE PROJECT
05/07 - 09/07 Radiant Networks Louisville, KY : FIELD ENGINEER
•1 Designed voice and data network systems
•2 Installed voice and data networks for hospitals
•3 Worked and installed CAT 5 lines
•4 Installed RDF antennas and repeaters
•5 Performed site survey walks
•6 Test and trouble-shooted T1 lines
10/06 - 04/07 AMX Telecommunications Dallas, TX : TOWER FOREMAN
•1 Managed site walks for company and external vendors
•2 Managed estimating and documenting construction cost to budget
•3 Daily supervision of two tower crews
•4 Communicated with clients on site issues, work flow schedule
•5 Managed deliverables, permits, and tracking of orders
•6 Managed New Build’s of CDMA and UMTS site’s
8/06 - Motorola/Verizon Denver, CO : FIELD ENGINEER
•1 Conducted EVDO programming, testing, and Cabinet Integration
•2 System calibration and ATP testing and replaced BBXs
•3 Tested and replaced GLIs, CSM, and Motorola Cabinets
2/06 - 7/06 Goodman Networks San Antonio, TX : FIELD ENGINEER
•1 Commissioned and green lit LMU providing daily feedback to management
•2 Performed site audits of equipment build-outs for LMU installs.
•3 Installed and replaced rectifiers, battery supply and battery racks.
11/05 - 1/06 Beacon Construction Alpharetta, GA : TOWER FOREMAN
•1 Worked closely on E911 Audits to ensure system accuracy
•2 Responsible for, site access, site prep, and LMU de-installation.
•3 Performed quality audit checks of equipment build-outs.
•4 Building of new site and Co- location on many type’s of tower’s.
4/05 - 9/05 S-COM Telecom Orange Co., CA : Construction Manager
•1 Commissioned and green-lit LMU ensuring regional accuracy and location.
•2 Troubleshoot and repaired LMU issues and malfunctions.
•3 Responsible for coordinating: equipment procurement, warehousing & distribution, site access logistics, site prep, and LMU de-installation.
3/05-4/05 Telnet Telecommunications Baltimore, MD :FIELD ENGINEER
•1 Performed BTS installation with polyphasers.
•2 Installed E-911 sites, LMUs, and GPS, Motorola 900 and Ericsson
•3 Performed sweep test with Anrisu tester on BTS installations.
11/04-3/05 Alcoa Telecomm Alpharetta, GA : Construction Manager
•1 Surveyed over 500 sites for T-Mobile performing basic maintenance
•2 Changed antennas on a variety of towers by performing Andrews 1.5 inch and 7/8s coax line repairs.
•3 Replaced Ericsson radio cabinets and tested and installed BTS with polyphasers.
5/03-6/04 Volt Telecomm Group Atlanta, GA : TOWER FOREMAN
•1 Operated JLG, basket and extension lifts used to maintain 1900 and 850 CDMA and UMTS overlay cellular sites across the state of California.
•2 Upgraded E911 sites, downloading and testing software, and color coding of fiber optic and standard lines and connectors.
•3 Ran fiber optic lines through conduits and sweep tested fiber optic lines across the state of California.
•4 Building of new CDMA and UMTS site’s all over the country
11/02-3/03 CTS Telecommunications Boston, MA : TOWER FOREMAN
•1 Ran Arisu type A and B devices, built ice bridges, ran Comscope and Andrews (coaxial) lines, and installed antennas.
•2 Read RF meters, performed silver work, and operated a Back-Hoe
•3 Performed microwave hopping and general tower maintenance, and set trapeze for coaxial lines.
11/01-2/02 Tierra Limited INC Chicago Ridge, IL : TOWER FOREMAN
•1 Performed Cad wielding, co-location, and system testing
•2 Did grounding, color coding, and set antennas in absence of shelters
•3 Performed general maintenance of towers, including inspections and sweep testing of fiber optic lines
7/01-10/01 Everclear Communications Walton, KY : FIELD TECH
•1 Installed 24 and 48 volt power supplies and replaced rectifiers and battery supply and battery racks
•2 Installed LMUs and BTS Cabinets and Ran GPS coordination.
•3 Performed general maintenance of towers, including inspections and sweep testing of fiber optic lines.
10/00-06/01 Divine Tower International Columbus, OH : MICROWAVE FOREMAN
•1 Stacked towers, ran Arisu type A and type B devices, built ice bridges, ran Comscope and fiber optic lines, and installed antennas.
•2 Read RF meters, performed silver work, and operated a Back-Hoe
•3 Set shelters, and general tower maintenance, and set trapeze for coaxial lines
•4 Building of Microwave site’s all over the country.
CERTIFICATIONS
Last Resume Update | February 12, 2015 |
Address | Covington |
![]() | |
Phone Number | ![]() |
Resume File | Christopher-Davis-tower-resume.docx 19.5 kB |
Spanish Speaking? | No |
Willing to Relocate? | Yes |
Years Experience | 18YR |