Installation Technician

Completed Pre­site surveys and inspections of lobby, drive up and off­site ATM installations.
Responsible for completing the construction process of on­site and off­site ATM installations which includes
concrete forming, pouring and finishing, electrical service and communications service.  Completed the
installation of ATM machines and completed the bring­live process which includes the following:
Communications termination and completion, Alarm wiring setup and verification, and camera wiring
termination setup and verification.
Assembly Shop Foreman
January 2015 – September 2015
Aquamarine Subsea Solutions
Pearland, TX.

Responsible for the overseeing of the assembly and test of the Paul B. Loyd Jr. BOP stack for Transocean.
Completed assembly and FAT testing on multiple MCCTLF for Diamond Offshore.
Responsible for training assembly personnel in 5S and API standards.
Setup and evaluated each team member during various training methods on BOP stack equipment, drill
through, controls and communications equipment.
Led a team of 6 to 10 individuals through various well procedures and hydrostatic testing.
Led a hydraulic troubleshooting course for assembly personnel.
Completed Acquisitions of hydrostatic and hydraulic pump equipment.
Installation and Commissioning Subsea Mechanical Engineer
November 2012 – January 2015
National Oilwell Varco / F.S.C.
Samsung Heavy Industries, Geoje Island, S. Korea

Completed inspection of incoming equipment received from International vendors.
Completed Installation and Commissioning of the Subsea Equipment package and In­hull Equipment
package.
Responsible for the service and commissioning on the in­hull equipment, including FRS, Diverter and
Diverter control panel and the in­hull mixing system.
Responsible for ensuring continuity between hardware and software to all control panels.
Responsible for the Service and repair of any subsea equipment delivered in a less than new condition.
While off rotation, served as a Quality Assurance engineer for Subsea equipment at the PCG facility.

Pressure Control / Research and Development Test Team Leader
September 2011 – November 2012
National Oilwell Varco / P.C.G.
Houston, TX.

Responsible for the lead of assembly and test technicians in the P.C.G. R&D facility.
Conducted a wide variety of A.P.I. and new product development testing per engineering request.
Responsible for communications with engineers and third party witnesses.
Worked alongside engineers in customer relations technical support as a product analyst.
NOV subsea product specialist.
Responsible for the setup, test and tear down process of test equipment which includes, ram BOP’s,
Spherical BOP’s, Grippers, Riser tools, stripping units and numerous other test fixtures.
Responsible for troubleshooting hydraulic, pneumatic and electronic systems within the test lab.
Responsible for the troubleshooting process of hydraulic driven operators.
Responsible for the tear down, scope and assembly process of various types of equipment within the R&D
facility.
Completed training and have been certified in hydraulic / pneumatic troubleshooting, Strain gauge, and
preventative maintenance / troubleshooting.
Assembly/Test Technician
February 2009 ­ September 2009
National Oilwell Varco / Mission Valve.
Houston, TX.

Completed assembly of valves and chokes according to schematics.
Completed assemblies and Hydro Testing according to the A.P.I. standards.
Performed Hydro Testing for third party witnesses and customer witness.
Provided all data on Tests performed for proper identification of tested material and equipment used.
Mechanic, Field Service
September 2008 ­ January 2009 Master Rig International.
Houston, TX.

Responsible for the lead of the tear down of Various Pieces of Drilling Equipment, I.E. Draw works, mud
pumps, Top drives, Rotary Tables, Traveling Blocks, Crowns, Etc.
Responsible for filing complete scope lists for job tear down, including Q.C. and Q.A. documentation.
Responsible for filing Part Requisitions for upcoming jobs.
Completed field service requests for various rig companies, I.E. Rowan, Pride, Ensco, Transocean and
Noble.

Assembly Technician
June 2007 – September 2008
Letourneau Technologies
Houston, TX.

Responsible for the complete build out of Letourneau line products including Draw works, mud pumps and
top drives.
Completed assembly of all items to engineering standard following a detailed BOM.
Worked hand in hand with engineering and designers on the rollout of the new Letourneau 500 ton and 750
ton top drive line.
Provided field service support on the mud pump line and did extensive travelling in an effort to support the

Last Resume Update April 26, 2016
Address Cypress
E-mail lock Locked
Phone Number lock Locked
Resume File Dustin_Orlando-Resume.pdf 110.62 kB
Spanish Speaking? No
Willing to Relocate? No
Years Experience 1

Contact Candidate

Login or purchase this resume contact details.