To obtain a position in a telecommunications company that offers a variety of challenges and opportunities and where I can develop and enhance my knowledge and skills. Provide opportunities for personal and professional growth, meeting people and further develop my skills.
PROFESSIONAL WORK EXPERIENCES
July .09, 2011 up to present
Penta Consulting Ltd.
Doha, Qatar
VODAFONE- Project Roll Out and Upgrade
Telecom Rigger technician
Duties and Responsibilities
Full BTS installation of Alcatel Lucent with Microwave Transmission Radio MPR, AWY and ADM MXC (VODAFONE Project)
Installation of Alcatel BTS MBO 1&2 Outdoor Cabinet.
Installation of GSM 900 and 1800, 2100 MHZ antennas and its accessories.
Installation of transmission antenna’s such RFS 1.6, 1.4, .06 and .03 Including Transmission Cables, outdoor unit
Installation of Microwave Radio’s like, MPR, ADM MXC and AWY. Including of (PCM) E1 cables, D/C power tapping
Rectify all substandard installation Quality Assurance.
Performed rectification activity under Vodafone Acceptance.
Assigned to perform Snags Rectification for all Vodafone Sites which includes; 30-65 M Mast Tower repair, Microwave and Panel Antenna Re-orientation
Installation of MCRRH-LTE 4G with dual fiber optic
Laying of RRH Power Cable and Termination
August 2, 2010 to July 02, 2011
Top express infrastructure.
9th Floor Champaca 2 Bldg.
162 L.P. Levistest corner H.V. De la Costa St.
Salcedo Village, Makati City.
Telecom rigger technician
Duties and Responsibilities
Performed site installation of OSN 1500/2500/3500/7500 including the power tapping activities.(Globe Project)
Conducts assessed and supervised the Sub contractor to do the card insertion and laying the fiber/patch cord.
Supervised and assessed the sub. contractor to laying the power cables from OSN/BWS cabinet going to the Main/Redundant Rectifier including power tapping activities.(globe project)
April 2010 to May 22, 2011
Penta Consulting Ltd.
Cape Town, South Africa
Cell C- Project Change Out Siemens Node-B to ZTE Equipment
Telecom Rigger technician
Duties and Responsibilities:
Installation of ZTE BTS 2G,3G according to ZTE standards.
Installation of jumper cables/connectors, combiner grounding and dc cables.
Installation of GSM 900 and 1800, 2100 MHZ antennas and its accessories.
Installation and alignment of ZTE, CERAGON, PDH equipment microwave antennas and radio.
Swap out of Siemens BTS to ZTE ZXSDR BS880 BTS, and panel antennas 900, 1800, 2100 Mhz to Triband antenna.
August 15 , 2009 march 30, 2010
Top express infrastructure
9th Floor Champaca 2 Bldg.
162 L.P. Levistest corner H.V. De la Costa St.
Salcedo Village, Makati City.
Telecom rigger technician
Duties and Responsibilities:
Performed installation of Cabinet Fringe core indoor runway globe project including of power tapping & other Accessories
Performed installation of Cabinet M-San Outdoor runway globe project. Including the card insertion and different kind of module.
Installation of Battery set of M-San Back-up power.
Installation for inner core 7500 & 1600 Cabinet and coordination for the power tapping job.
Performed installation of 4G sectorial panel antenna ALU project in Liberty site. Including the RFS 7/8 cable feeder, installation the cable grounding w/ the cable accessories.
April 27, 2004 to June 15, 2009
INTEX TELECOM SYSTEM
221 Nicanor Garcia st. Makati cityPhilippines
Nokia-SMART and GLOBE- Project 2G, 3G Roll Out
Telecom Rigger tower erection
Duties and Responsibilities
Performed installation of 2G, BTS Ultra site, Node-B.
Installation and alignment of Mw antenna flexi hopper 1.2 to 3.0 meter.
Installation of Eltek rectifier including power tapping and back up battery.
Performed installation of (SDH) Microwave antenna size of 1.4 Meters and taken of AGC power of the radio.
Performed installation and alignment of 3G Flexi BTS antenna.
Performed Installation of different types of LDF cable such as: LDF-750,LDF-550&LDF-450
Performed installation of cable grounding Antenna groundings including the hardware accessories.
Installation and assessed cabling (inter-cabinet and external interfaces cabling)
Tower Erector and Maintinance
Tower Climbing 180 Ft. (60m)
November 12.2008 to June 21.2009
INTEX TELECOM SYSTEM
Wisma 46,43rd Floor, Jl. Jend. Sudirman Kav.1 Jakarta, Indonesia
Telecom Cell- Project 2G, Roll Out and Upgrade
Telecom Rigger technician
Duties and Responsibilities:
Performed installation of (SDH) Microwave antenna size of 1.4 Meters and
taken of AGC power of the radio.
Performed installation and alignment of 3G Flexi BTS antenna.
Performed Installation of different types of LDF cable such as: LDF-750,LDF-550&LDF-450
Performed installation of cable grounding Antenna groundings including the hardware accessories.
Installation and assessed cabling (inter-cabinet and external interfaces cabling) and PIU installation
Perform installation of MGW U4 and MSS M14 racks; by core)project
Supervise partners in the installation of the BTS and antenna system
Philippine Yacht Club
Marina bay, Manila City Metro Manila.
July 30 2010 to April 25 2012
Maintenance of boat 750 cc and 300 cc out board and in board
Trouble shooting of electrical
Referring body part of boat with fiver glass and painting
July.7.1994 to May.12, 1998
D’OCCIDENTAL TIN CAN MANUFACTURING
143 Captain Cruz Street Parada, Valenzuela city
Printing Pressman Operator
Forklift operator
Operator of printing press coater feeder unloaded
Maintenance and trouble shooting for the printing machine
Including oven and repair any parts of machine
Operator power press
Fabricator and welding jobs
Forklift operator
Summary skills:
Tower rigger Technician
A/C D/C Main Power
Driver Vehicle
Fabrication and Welding Jobs
Tower erection / Civil Works
Rope access
Printing press, coater, power press operator
Gas diesel mechanics
Motor cycle mechanics
Car painter and body repair
Forklift operator
Trainings and Seminars:
Tower Climbing Safety Training (July 07, 2015)
ENERTECH Qatar
Gas Diesel Mechanics,( June 04, 2010 to June 30,2011
ELECTRON TECHNICAL TREANING CENTER INC.
H43TPX Straight Diesel Boom Lift (ID no. 27760816252)
17 August 2013
Falck Safety Services
August 28, 2015 - 2017
Personal Character:
Age: 37yrs old
Sex: Male
Civil Status: Married
Religion: Catholic
Citizenship: Filipino
Address: 2325 Pablo St. Gen. T De Leon Valenzuela City
B. date: Dec. 29, 1977
Height: 5”5
Weight: 110 lbs.
I hereby certify that above statements are true to the best of my knowledge and belief
ERIC B. MARTINEZ
Application
Last Resume Update | January 7, 2016 |
Address | Doha |
![]() | |
Resume File | ERIC-BABASA-MARTINEZ.docx 69.88 kB |