

Work from Blue Prints Will Travel Work Extended Hours
GARY HARVEY & ASSOCIATES Oct. 2014 to July 2016 Telecommunication Technician Birmingham, AL Responsibilities: Pulled data and voice cable from cable hub to needed locations. Dropped or fish cable down walls. Terminated cable to jacks and patch panels, 110& 66 block, POTS and VOIP. I have no problems with MOP or coordinating with IT personnel on job site. Tested cable and fire stop preparation. Read blue prints. Determines materials needed. Maintain materials usage and inventory control.
Compucom April.2014 to Sept. 2014
Support System Analyst
Dallas,Tx
Responsibilities: Installed VOIP phone system in Walgreens drug stores, installed paging, music on hold and drive thru system.
CSI Technology Outfitters Jan.2012 to Sept.2012
Telecommunication Technician
Easley, SC
Responsibilities: Pulled data and voice cable from cable hub to needed locations. Dropped or fish cable down walls. Terminated cable to jacks and patch panels. Tested ,mud and fire stop preparation. Read blue prints Determines materials needed. Maintain materials usage and inventory control.
GARY HARVEY & ASSOCIATES June 2007 to Dec. 2008
Telecommunication Technician
Birmingham, AL.
Responsibilities: Pulled data and voice cable from cable hub to needed locations. Dropped or fish cable down walls. Terminated cable to jacks and patch panels, 110& 66 block, POTS and VOIP. I have no problems with MOP or coordinating with IT personnel on job site. Tested fire stop preparation. Read blue prints. Determines materials needed. Maintain materials usage and inventory control.
SPANCOM SERVICES July 2006 to Jan 2007
Telecommunication Technician
Birmingham, AL.
Responsibilities: Pulled data and voice cable from cable hub to needed locations. Dropped or fished cable down walls. Terminated cable to jacks and patch panels. Tested cable, mud and fire stopped preparation. Read blue prints, determines materials needed. Worked with main line aerial and underground fiber construction.
NETWORKING COMMUNICATION TECHNOLOGY Oct. 2005 to Jan. 2006
Telecommunication Technician
Charlotte, N.C.
Responsibilities: Pulled data and voice cable from cable hub to needed locations, dropped or fished cable down walls. Terminate cable to jacks and patch panels put on fan out kits and terminations (ST/SC/MTRJ) CONNECTORS. Tested cable using Fluke and Idea tester, fire stop preparation, read blue prints and determines materials needed for the job. Maintain materials usage and inventory control.
GARY HARVEY & ASSOCIATES Dec. 2004 to June 2005
Telecommunication Technician
Birmingham, AL.
Responsibilities: Pulled data and voice cable from cable hub to needed locations. Dropped or fish cable down walls. Terminated cable to jacks and patch panels. Tested, mud and fire stopped preparation. Read blue prints Determines materials needed. Maintain materials usage and inventory control.
CUSTOM TELEPHONE SERVICES May 2004 to Nov. 2004
Telecommunication Technician
Birmingham, AL.
Responsibilities: Familiar with EIA/TIA and some NEC standards, capable of identifying, pulling, terminating and labeling Cat3, 5e and Cat 6.Fiber optic cable experience as well as installing support structures. Install cable support structures latter rack, cable tray, and J-hooks.
MARATHON ELECTRICALCONTRACTORS, INC. Dec.2003 to May 2004
Electrician Apprentice
Birmingham, AL.
Responsibilities: Bend pipes. Pull wire and power cable. Make up wire taps. Terminate wire in panel boxes. Terminate power cable at transformers. Install panels and lights
APEX SYSTEMS Inc. March 2000 to Sept. 2000
Telecommunication Technician
Charlotte, N.C.
Responsibilities: Install communication cable, CAT3, CAT5, 125 pair cable to 300 pair cable, fiber optic, iron work, latter rack and extension work.
COMTEC PLUS March 1999 to Sept. 1999
Low Voltage Installer
Rock Hill, S.C.
Responsibilities: Pre-wire houses and commercial structures for cable television, telephone, and alarm system hook ups.
AT&T August 1989 to April 1991
Communication Equipment Installer
Charlotte, N.C.
Responsibilities: (1) Pulling and sewing cable, assemble and installing wiring bays, familiar with POTS. Wired bays with electrical power and communication cable Installed work, latter racks, extensions, and fiber ducts. (2) One and a half years experience in fiber optic laboratory preparing fiber cable, putting on connectors, (single and multi-mode), and DB testing cable. (3) Supervised entire laboratory operations for two months
J. P. MAXIMA COMPANY OF SOUTH CAROLINA April 1984 to June 1988
Machine Operator/Superior
Winnsboro, S.C.
Responsibilities: (1) Supervised entire Amp Line Department. (2) Operated stripping and cable cutting machine to prepare cable for harnesses. (3) Assisted in supervising Wire Crimping Department. (4) Operated and trained employees on injection molding machine.
INSIGHT CABLE COMPANY May 1984 to October 1984
Aerial Main Line Construction
Rock Hill, S.C.
Responsibilities: Worked with subcontractor. Climbed poles, drilled holes threw poles. Hung and lanced feeder and truck to strand cable. Main line CATV.
NIXION & BARTON CABLE COMPANY June 1982 to April 1984
Cable Television Installer
Responsibilities: Climbed poles and pulled cable from pole to homes and commercial structures
Last Resume Update | March 15, 2017 |
Address | Charlotte |
![]() ![]() ![]() | |
Phone Number | ![]() ![]() ![]() |
Resume File | GARY-ARMSTRONG-up-to-date-resume-8-2016.doc 79 kB |