
Field Service
3.0 GPA Study emphasis: Technology, Micro-Electronics, Solar Energy,
Technical Writing, PLC Training
Working toward the A.A.S in Automated Control Systems
1999-2003 Forest Grove High School Forest Grove, OR
3.4 GPA Study emphasis: Computer, Technology, Math and Science
Work Experience:
July 2015 –Present Jonas & Redmann USA, Inc. Concord, NC
Field Service Engineer
- Commissioning of New Battery Technology Machines
- Troubleshooting Electrical problems
- Troubleshooting Mechanical Issues
- Implementation of modifications to machines
- Q/A testing to ensure all robots are operating correctly
- Q/A PLC programs
- Q/A production process
January 2013-June 2015 Tokyo Electron Hillsboro, OR/ Chandler, AZ/ Malta, NY
Field Service/ Start-up Engineer
- Lead Clean Track (CT) Lithius PRO/Pro-V installer
- Installation of Re-Used CT Lithius Pro-V equipment
- Level 1 certified on CT Lithius PRO/Pro-V equipment
- Training for Level 2 certification for CT Lithius Pro/Pro-v equipment
- Training on Lithius Pro-Z
- Lock out/Tag Out Trained and certified
- Overhead Harness Rigging trained and certified
- Responsible for Robotic arm position teaching
- Responsible for Oven temperature calibrations to meet customers’ needs
- Responsible for setting up dispense conditioning of chemicals
- Installation of CT Lithius Pro/Pro-V equipment
- Run Customers Acceptence Testing Procedure (ATP)
- Electrical wiring and trouble shooting down to component level
- Mechanical and Software set up of and CT Lithius Pro/Pro-V equipment
- SL1, SL2 and SL3 Set up of CT Lithius Pro/Pro-V equipment
- Installation of Modifications to CT Lithius Pro/Pro-V equipment as Field Change Notices (FCN) came in
- Traveled between different customer sites to perform CT Lithus Pro/Pro-V equipment installation
January 2012-January 2013Tokyo Electron w/ NSTAR Hillsboro, OR
Resource Engineer
- Installation of Surface Preparation Systems (SPS) and Clean Track (CT) equipment
- Electrical wiring and trouble shooting down to component level
- Mecahnical and Software set up of SPS and CT equipment
- SL1, SL2 and SL3 Set up of CT and SPS equipment
- Installation of Modifications to CT and SPS equipment as Field Change Notices (FCN) came in
- Traveled between different customer sites to perform equipment installation for SPS and CT
October 2007-January 2012SolarWorld/Module Hillsboro, OR
Maintenance Technician 1
- Troubleshoot, repair, problem-solve, and maintain all manufacturing equipment
- Disassemble robot equipment to repair or replace defective circuit boards, sensors, controllers, encoders, servomotors, servo valves
- Develop maintenance procedures, maintenance schedules, and instructions
- Perform scheduled preventative maintenance for tools, robotics, and other automated equipment.
- Initiate continuous improvements to improve uptime, safety, quality and overall cost reductions.
- Helped with the ramp-up of the module department,
- Trained new employees
- Traveled to Germany for PAT(Pre-Acceptance Testing)
- Developed and implemented work instructions
- Managed 15 or more employees in three different departments
- Started Technician level 3 training
- Certified in pump rebuilds, Certified Peer-Trainer, Respirator certified
Last Resume Update | November 13, 2015 |
Address | Charlotte |
![]() | |
Phone Number | ![]() |
Resume File | Gurden_Jr_Gregory..doc 34.5 kB |
Spanish Speaking? | No |
Willing to Relocate? | Yes |
Years Experience | 3 |