Cell Phone: +52 1 xxx-xxx-xxxx
Cell Phone: +1 xxx-xxx-xxxx
Drive Licence: 01N3824547
Professional License: 11482051-C1
Passport: G31519965
Email: xxx@xxx.com
ACADEMIC TRAININGxxx-xxx-xxxx Computer Systems Engineer Instituto Tecnologico Superior de Acayucanxxx-xxx-xxxx High School Telebachilerato “Corral Nuevo”xxx-xxx-xxxx José Vasconcelos High School Key "30DTVO241O"xxx-xxx-xxxx Primary School Benito Juarez
PROFESSIONAL EXPERIENCE
Tower Lead SKYNET LCC Actually
Climb Tower for Installation Antenna, Installation AMOB Nokia, COVP, Fiber Optic, Cabinet, Upgrade to 5G, Overlay, Installation BOOM, TMA's, diplexers, COAX, grounding, supports, weatherproofing, Jumper Hybrid, All for T-Mobile.
Radiofrequency Engineer telefonica Movistar (VantExgon)
attention to failures in Radio Base
Assembly and disassembly of tower equipment, RRU, RF antennas,MW
Installation in Cellular Towers, (Umts) 3G and 2g (Gsm), LTE MW
Site Survey
Work with FO
100% Work in Cellular Towers
Configuration of huawei rtn 905, Ceragon IP 20 Siae Alfo, Siae Alcplus, Alcplus 2, Ubiquiti, Huawei
Supervisor I&C for AT&T(Iberica)
Supervision of work crews Installation and Commissioning enodeb, nodeb Huawei
Microwave link configuration Ceragon, Huawei
Assembly Equipment in Tower
100% Work in Cellular Towers
EHS
Test RFC
Assembly and disassembly of tower equipment, RRU, RF antennas
Installation in Cellular Towers, (Umts) 3G and 2g (Gsm), LTE , MW
Coordinator Ceragon Network Guadalajara Area (Iberica)
Supervision of work crews Installation and Commissioning Link MW IP20G,IP20C,IP20N,IP10 1+1HSB,MIMO,1+0,2+0,2+0SD
Test RFC
Site Survey
Work with FO
100% Work in Cellular Towers
EHS
Assembly and disassembly of tower equipment, RRU, RF antennas
Installation of AISG, Ret SBT
Supervisor VDSL& Gpon Alcatel-Lucent- Nokia (Presea)
Supervision of work crews Installation and Commissioning equipment VDSL
Site Survey
Configuration of Switching Equipment 7302, 7330 transmissionxxx-xxx-xxxx, 1531 Clas
EHS
Movistar Customer Service and Integration Supervisor
Supervision of work crews Installation MW &RF
Integration (configuration) of clients with equipment Ceragon IP20, Siae Alfo, Siae Alcplus, Alcplus 2, Ubiquiti, Huawei
Assembly and disassembly of tower equipment, RRU, RF antennas
Installation in Cellular Towers, (Umts) 3G and 2g (Gsm), LTE with equipment Nokia,Huawei
100% Work in Cellular Towers
Telecommunications Links Installer (Gi Telecommunications)
Installation in microwave tower, (Umts) 3G and 2g (Gsm), LTE
Configuration of huawei rtn 905, Ceragon IP 20 Siae Alfo, Siae Alcplus, Alcplus 2, Ubiquiti, Huawei
Installation of AISG, Ret SBT
100% Work in Cellular Towers
OTHER AREAS OF KNOWLEDGE
Operation OTDR, JDSU, SITE MASTER
Management of Regulations and Installation Methods
WORK REFERENCES
Monserrat Zambrano Human Resources Iberica +52 1 xxx-xxx-xxxx
Eduardo Lopez, Head of Technical Support Ceragon +52 1 xxx-xxx-xxxx
Nokia, Gonzalo Moralez Verduzco, Roll Mananger Nokia Northwest- West Mobile +52 1 xxx-xxx-xxxx
Direct manager at Telefónica Movistar, Héctor Antonio García Aragón, Head of Operations and Maintenance Regional R6, xxx-xxx-xxxx Ext 63763 Mobile +52 1 xxx-xxx-xxxx
GI Telecomunicaciones, Luis Villaseñor Supervisor, +52 1xxx-xxx-xxxx
Last Resume Update | June 13, 2019 |
Address | Zapopan |
| |
Phone Number | |
Resume File | Curriculum-JAIR-TADEO_Ingles.docx 78.11 kB |