ACADEMIC INFORMATION:
Higher Technician in Electricity (1999)
Instituto Universitario de Tecnología Antonio José de Sucre.
Electrical Maintenance (Caracas – Venezuela)
Technical Maintenance Electrician (1995).
Instituto Nacional de Cooperacion Educativa Miranda (Caracas – Venezuela)
TECHNICAL TRAINING:
●2016 – Base Band 5216 Commissioning NodeB LTE ●2014 – Smart Laptop Commissioning Node B LTE
Ericsson (Digicel --Barbados) Ericsson (Digicel --Barbados)
●2015 – PCB-05 & Mini Link TN – WCDMA. ●2014 – Mini Link; Networks Proteus MX.
Ericsson (Digicel --Trinidad & Tobago) MIO Wireless – Aruba.
●2013 – IM200 CDMA Alarm Tool. ●2012 – Climbing and rescue. Safe Site b.v.
MIO Wireless – Aruba. Digicel – Curacao.
●2012 – Mini Link TN, Field Maint. & Inst. ●2011 – WCDMA RBS 6102 Field Maintenance.
Ericsson – Curacao. Ericsson – Curacao.
●2012 – RAN 10.0 – Configuration & software upgrade. ●2011 – WCDMA RBS 6201 Field Maintenance.
Ericsson – Antigua. Ericsson – Curacao.
●2011 – Mini-Link TNR4 Operation & Maintenance. ●2011 – GSM RBS 6102 Field Maintenance
Ericsson – Curacao. Ericsson – Curacao.
●2011 – RBS 6000 Overview. ●2011 – TEMS Investigation 12, ASCOM
Ericsson – Curacao. Ericsson – Curacao.
●2011 – WCDMA System Overview. ●2011 – OSS and monitoring tool.
Ericsson – Aruba. Digicel (Aruba and Curacao)
●2010 – WINFIOL System Overview. ●2010 – Mini link TN Overview.
Digicel - Aruba. Ericsson – Curacao.
●2010 – AXE System. ●2006 – ULTOP (BTS EDGE)
Digicel – Curacao. NOKIA – Brazil.
●2006 – UMG 9800 - UA5600 & BTS Configuration. ●2006 – P.I.S.I.M – CLEANUP.
HUAWEI – Venezuela. NOKIA – Venezuela.
CORE COMPETENCIES:
● Performance Monitoring and Optimization. ●Multi-tasking and Project Management.
● Systems Integration and Data Migration. ●Hardware Installation and Configuration.
● Cost Control. ●Leadership Skills.
● Time Management, Communication Skills. ●Diagnosis, Troubleshooting and Repair.
● Disaster Recovery Planning, MOP. ●Strategic Planning and Tactical Execution.
● Knowledge in: CDMA, 2G, 3G and LTE. ●Spare Part management
PROFESI0NAL EXPERIENCE:
FREELANCE WORKER ● September, 2015 – December 2016
Aspirona System LTD
Maraj St. #2, Chaguanas, Trinidad WI. ● Phone: +xxx-xxx-xxxx -- +xxx-xxx-xxxx
Activities executed:
● Installation of new sites LTE (Ericsson – PBC-05)
● Running scripts; loading software and licenses for RBS and Transmission as well (O&M)
● Supervising and coordinating all the activities for installations, teams, schedules, requesting parts and materials. Including the quality and safety on sites.
● Installation of new links for the LTE sites, including Long-haul links, loading of software, connectivity LAN/WAN setup and traffic on new links, hardware and troubleshooting as well.
FREELANCE WORKER ● March, 2015 – September, 2015
TWS Caribbean N.B.
Santa Rosaweg #7, Willemstad – Curacao. ● Phone: +xxx-xxx-xxxx
Activities executed:
● Installation of new sites 4G (Ericsson – RBS 6001) hardware installation and Transmission too.
● Installation of new sites (Point to multi-point) hardware, tower activities too.
● Maintenance on telecommunication towers (Aruba and Bonaire)
NETWORK ENGINEER ●June, 2013 - November, 2014
DTH Television and Communications NV. (MIO Aruba)
AV. Milo Croes # 22-A. Oranjestad, Aruba. ● Phone: xxx-xxx-xxxx
Activities executed:
● Daily monitoring of the network (Huawei- CDMA) KPI report, alarms, Drop calls, monitoring the traffic.
● Maintenance of RBS, cell site and transmission (Software, hardware, parts, etc.)
● Building new sites, handling of the activities related to (Permits, Subcontractor, Management, etc.)
● Drive test, collecting data, also tasks on the BSC after the data collection.
SENIOR NOC Engineer Support. ●August, 2009 - April, 2013
DIGICEL Dutch Caribbean.
LG Smith Boulevard #60. Oranjestad, Aruba. ● Phone: xxx-xxx-xxxx
Activities executed:
● Maintenance of CDMA, GSM and 4G sites. (Ericsson and Huawei)
● Maintenance and upgrading of the transmission.
● Monitoring the network using BSC, RAN, OSS and SOEM.
● Activities related to (Licenses, adding capacity, VLANs, software, protections, Etc.)
● Drive test (data collection)
● Adding new sites (GMS and 4G) using BSC, RAN and SOEM.
● Requesting of PW, preparing MOP to execute activities on the network.
ELECTRICAL SUPERVISOR ● Feb, 2008 – Sept, 2009.
Shipel Electrical Contractor, N.V.
Sereo Blanco 46-G, Oranjestad - Aruba ● Phone: xxx-xxx-xxxx - xxx-xxx-xxxx
| Last Resume Update | March 30, 2017 |
| Address | Chicago |
Locked | |
| Phone Number | Locked |
| Resume File | Luis-Este-CV_Ch..docx 23.03 kB |
| Spanish Speaking? | Yes |
| Willing to Relocate? | No |
| Years Experience | 20 |

Locked