Computer Systems professional degree, Instituto Tecnologico Tlajomulco Jalisco.

Nokia 2G 3G LTE Modernization and Installation certification.

Nokia Install & Commissioning & Integration for T Mobile Greenfield TMO 700/ Greenfield

Certification in Tower Climbing Safety & rescue.

Certification in CPR & First Aid

PTID provided by Nokia

PIM Master certification

OSHA 10 certification

Bechtel Passport

Sunbelt certification

Forklift certification

Representative Clients

3S Network Inc

BBG Wireless USA Inc

Continental Automotive Guadalajara

Intel (Kelly services)

Comercializadora de Valor agregado CVA

Language

Fluent in Spanish

English (60%)

Professional Experience

RBS Engineer Foreman / 3S Network Inc / H1B Visa

(May 2013– Jan 2016)

Development ofcloseouts.

Experience with Integration/installation/troubleshooting of Nokia cell site equipment (Flexi and/or ultrasite).

Leadership skills and ability to prioritize and complete multiple tasks.

Able to work independently or in a team environment.

Flexibility withever-changing environments and priorities.

Understand basic RF Engineering, Radio Frequency theory, and Electricity and Electronics theory. 

Crew lead.

Tower Climber.

PIM sweeps.

GSM optimization.

UMTS optimization.

LTE installation.

Tower maintenance.

Recognition of safety hazards and performance duties in a safe manner.

Foreman Seattle market. Arizona market.

Sweeps (Distance to Fault, Return Lost testing)

Read andinterpretation of MOP (method of procedures) documents.

Clean Up’s

Troubleshooting (Tiger Team)

Assembled and install of antennas.

Azimuth and down tilt.

Fiber optic test and scope.

Jumper and coax installation and replacement.

Use and care of hand tools and mechanical equipment.

Use and care of company vehicles.

Development of purchase orders.

Involved in Ericsson, T mobile, Sprint, Cellular One, AT&T installations.

Field Engineer / BBG Wireless USA Inc/ TN Visa

(June 2012– February 2013)
T-mobile modernization GSM,UMTS,LTE

Cabinet installation BBU, MMBS

Sweeps

CDMA optimization.

UMTS optimization.

LTE installation.

Adjustment antenna azimuth and down tilt.

Assembled and install of antennas. Nokia

Jumper and coax installation and replacement.

Closeouts development.

Read andinterpretation of MOP (method of procedures) documents.

Crew lead..

Performstower maintenance.

Involved in reporting all bugs during installation.

Trained team members with project knowledge and business processes.

Knowledge in Proteus, Cricket, General Dynamics, T Mobile, Telefonica (Mx), Nokia, Sprint.

Worked as Field Engineer in Michigan, Texas, and Washington.

Tower Climber

Knowledge in Ericsson, Nokia Siemens technologies.

Test Engineer / Continental Automotive.

(November 2010 – December 2011)
I was involved in documenting Test Plan of software.

Used MS Office suite (Word, Excel, Access, Visio, Power Point and Outlook) for project tracking, documentation, and presentation.

I took the responsibility of identifying new process, finding out gaps in existing process, arranging meetings.

Worked closely with developers and a variety of end users to ensure technical compatibility and user satisfaction.

Developed Use Case Diagrams ,Business context Diagrams , flowcharts

Modeled the information, and then came up with the requirements prioritization. Eliminated false requirements by screening out multiple versions of user input. Final prioritization was based on an intensive analysis of both, product, and process requirements.

Created Requirement Traceability Matrix to ensure that all the requirements are covered by the test cases.

Prepared reports and presentations for weekly management meeting to update senior management staff on project deliverables, progression and timelines.

Trained team members with project knowledge and business processes.

Experienced in working with UTAS language to automated testing.

Experienced in working with CANOe language to create scenarios.

Experienced in working with MRDBdefect tracking.

Trained in Auburn Hills, MI.

Day to day interface with customers (Ford) ensuring positive Customer Relationship Management.

Worked with QA team to design test plan and test cases for User Acceptance.

Involved in all the phases of a System Development Life Cycle (SDLC) to ensure that business objectives were met.

Evaluated solutions for business problems and evaluated alternate methods to increase efficiency and improve control. Analyzed and documented information system requirements and the corresponding impact on business processes.

Technical of validation / Intel (Kelly Services) .

(May 2010 – October 2010)
I was involved in documenting Test Plan of software

I was involved in Test of Hardware.

Prepared reports and presentations for weekly management meeting to update senior management staff on project deliverables, progression and timelines.

Used MS Office suite (Word, Excel, Access, Visio, Power Point and Outlook) for project tracking, documentation, and presentation.

During my instance in this job, I was technical of validation on some microprocessors.

Installation and testing of different operating systems.

Created Requirement Traceability Matrix to ensure that all the requirements are covered by the test cases.

Worked with QA team to design test plan and test cases for User Acceptance.

Participated in data analysis for verification purposes.

Involved in all the phases of a System Development Life Cycle (SDLC) to ensure that business objectives were met.

Assisted the testing team in preparing Test Plans and Test cases, detecting bugs in the system.

Technical of validation and assembly / Comercializadora de Valor Agregado (CVA)

(January 2009 – January 2010)
Involved ininstallation and testing of different operating systems.

Involved in assembly of devices and computers brand GHIA.

Used MS Office suite (Word, Excel, Access, Visio, Power Point and Outlook) for project tracking, documentation, and presentation.

Implemented metrics and process methods to influence other cross-group organizations to adopt new processes that lead to improvements across the licensing development ecosystem.

Implemented Project to introduce Enterprise Risk Management to increase senior management awareness impacting revenue recognition and to customer/partner experience regarding quarterly release program enhancement/deployment activities.

Managed Technical support staff.

-2-
RESUME

xxx@xxx.com
Phonexxx-xxx-xxxx

Oscar Israel Hernandez Rodriguez
6232 S 251st St Apt QQ101, Kent WA 98032

Page 1 of 3

Last Resume Update January 19, 2016
Address Seattle
E-mail lock Locked
Phone Number lock Locked
Resume File Resume-Oscar-Hernandez.docx 31.58 kB

Contact Candidate

Login or purchase this resume contact details.