field engineer

Technical Order 28 X-Ray Equipment, Passenger Pre-Screening and Scanning Equipment
Audit and Inventory Project. O’Hare Airport, Chicago
Senior Field Engineer
Ericsson, Elmhurst,IL 2009-2014
Main responsibility:
Installed/maintained/commissioned ClearWire/Sprint 4G LTE System.
Trained and Supervised Numerous Contractors in Network Vision technical procedures.
Cooridinated ComCast/ATT Fiber Extension BackHaul Project increasing customer capacity.
Precommissioned unprecedented ClearWire/Sprint Microwave Backhaul System.
Launched SamSung Commissioning Project on time within budget.
Implemented LTE Antenna Optimization Project and minimized customer impact.
Facilitated Transitional LTE Collateral Damage/Mitigation Control Project.
Systematized Plex to Atlas Inventory Transitioning Control Project.
In Home Lead Technician III
CIRCUIT CITY, Schaumburg,IL 2004-2009
Main responsibility:
Managed cost reduction project effectively, lowering turnaround time.
Trained new Firedog hires on technical procedures and corporate objective.
Mentored colleagues in parts management to improve turn around time.
Cooridinated Store and Asset Control System and reduced turn around time.
Automated Customer Service Documentation Control System.
Modernized Parts Inventory Control System and reduced costs.
Effectively supervised partial store closure protecting customer Data.

Field Engineer Level III
VERIZON WIRELESS, Schaumburg,IL 1999–2003
Main responsibility:
Managed O'Hare Hilton Site grounding project to completion.
Carried out T1 Extended Super Frame Implementation Project.
Supervised Battery Drain Thermal imaging test project safely.
Cooridinated CDMA Site Commissioning Project effectively.
Executed Secondary Redundant Satellite Implementation Project.
Centralized Glenayre Switch relocation Project without customer impact.
Facilitated Site Management Project and brought sites up to standards.

System Engineer II
PAgenet, Burridge,IL 1993–1999
Main responsibility:
Launched FCC MPE maximum permissible exposure Radiation Compliance Project.
Managed multi-frequency conversion to Gillat Satellite backhaul project.
Implemented US Steel transmitter for a day project and retained contract.
Launched VoiceNow 2Way Paging System implementation project.
Implemented VoiceNow Antenna Optimization Project.
Dealt with Motorola Nucleus II Software Upgrade Project in four states.
Supervised Chicago Tower Leasing Site Initialization Project.

Field Service Engineer II
ARINC Rockwell Collins, O'Hare Airport, Chicago,IL 1988–1993
Main responsibility:
Maintained Voice and Data Systems for Airlines and FAA across United States, Canada and Puerto Rico on an on call basis, responding within minutes.
Crisis managed damage from Hurricane Hugo, San Juan Puerto Rico.
Installed O'Hare Airport Predeparture Clearance System for FAA.
Improved Distributed Antenna System Canadian Department of Transportation.
Completed Terminal Five OHare Airport repeater system project.
Commissioned American Airlines Centricom II commissioning project.
Assisted with Canadian EACARS enhanced data aquisition Implementation Project.

Academic Credentials
Keller Graduate School of Management
Master of Project Management
2017(Projected Graduation)
Southern Illinois University, Carbondale, IL
Bachelor of Science in Aviation Management 1988
Associate Degree in Avionics Technology 1987
Certifications

FCC GROL General Radio Telephone Operators License
EPA HVAC Certification 2009
LUCENT AUTOPLEX CDMA Certification 2003
SamSung CDMA/LTE Core Ran Certification 2013
CISCO ROUTER Certification 2012
Motorola CentraCom II Certification 1993
Security Clearances
FAA Security Clearance 2014

Last Resume Update May 10, 2015
Address Roselle
E-mail lock Locked
Phone Number lock Locked
Resume File 2015-Resume-Pete-Powell-Raytheon.docx 24.93 kB
Spanish Speaking? No
Willing to Relocate? No
Years Experience 25

Contact Candidate

Login or purchase this resume contact details.