

rdcruz privera
1
P HILIP
R IVERA
531
Sancado Terrace,
Fallbrook,
CA 92028
xxx@xxx.com
xxx-xxx-xxxx
C
AREER O
BJECTIVE
Versatile, detail-oriented
professional with
extensive experience
in Cell
site Construction
and Field Engineering
/OSP .
I
am eager
to offer
my knowledge
and application
of procedures
toward supporting
the
employer optimizing
operational performance.
P ROFILE
More than
1 2
+ years
of experience
in
construction of
cell
sites to
include
– Raw
Land,
TI’ s (tenet
improvement),
Mono Pole/Palms,
stealth/design,
roof tops
, stacking
towers
and testing .
Mobile cell
sites
on wheels
(cows) ,
Cell
site maintenance
and
trouble s hooting for RF/VSWR, RET
, DC, and Fiber .
OSP Audit/ Design using
MicroStation and AutoCAD preparing construction drawings.
K EY
S KILLS
Knowledge of
Testing and integrating
LTE, AWS, UMTS, GSM , PCS
, WCS , Fiber
and AAT/Sunsight .
Proficient
with
MS Office
, MicroStation /
AutoCAD, design inputs, field notes and verbal communication.
Good
eye
for detail
in
safety and
quality
P ROFESSIONAL
E XPERIENCE
Tower Foreman
: Echo Pacific
Construction
–
2066 Aldergrove
Ave.,Escondido,
CA
92029 (0
6 -2014 –
12-2015)
TMOL700, San Diego, Nor Cal and NV.
Sprint NV /
2.5 /combiner R/R ,
AT&T -LTE-3C, 5C ,WCS
and
Verizon -LTE/AWS
. Quality
Control and
Quality
Assurance, site
crew
in house training
for Fiber,
Sweep,
PIM and
DC
install.
Trouble Ticket repair (Verizon, AT&T and Sprint)
Tower
operation
installs, AAT, COP/Pictures and integration.
Pre-construction prep aration
using MicroStation
and AutoCAD for material take-offs.
P ost punch walks coordinated with Land Lord, site tech and Customer C
onstruction M anager
.
Safety planners –
Job Hazard Analysis, Job Safety Analysis, Pre-Construction Schedule planning and Daily.
JCN sign
off
with Landlord’ s
satisfaction
for completion.
Signed- Red Line RFDS and Final CD/blueprints .
Cell
site
maintenance department
Manager:
ProCell, 3020
West
Harvard St.,
Santa
Ana. CA.
2
-2013 –
6
-2014
Maintained
Customer
- Sprint/Ericsson-SMRT
portal
for trouble
ticket
request for
Sprint,
Verizon and
AT&T
with 5
crews.
Regional mapping,
Arizona,
Northern California
and
Southern California.
MS
Project updates
Install
and
Repairing DAS
systems,
fiber, RRU
replacements,
RF/VSWR- issues,
Antenna
and Microwave/RSSI
inspection/replacement
of system
utilizing
scanners, sweep
anritsu and
spectrum
analyzers.
Fiber
Testing
with JDSU,
MP-60(Power)
and P5000
(Visual/Optic)
- power
meters,
optical test
equipment.
Responding
to
Critical Cell
site
Power outages
due
to thefts
and
TX/RX failures.
Coordinated
with
Landlord, cell
site
technicians ,
subcontractors with
legacy issues - scheduling
and
materials, to
ensure
smooth operations
and
successful installation/repairs
of
respective components
.
Audits using
MicroStation and AutoCAD .
Budget development and execution for m aintaining
materials on
hand , tracked
performance against strategic goals and objectives .
Crew
Scheduling,
Invoicing, Billing
and
SMRT portal
updates
on completions.
Lead
Field
Engineer: SkyHawk Wireless - A
ndrew/Comscope, V
erizon - LTE,
Amarillo,
TX Completed
09/2012 .
Verizon
LTE
Amarillo, T
exas -
BOM preparation for LTE .
Pre
- Construction
Site walks
for
OSP Design using Micro S tation and AutoCAD preparing OSP
construction drawings for permit submittals. Accurate detail drawings based on permitting ordinances, design inputs and sketches.
BOM preparation
for
Raw Land,
Co
Locations, Roof
Tops
and Vaults.
Contracted
through SkyHawk
Wireless .
Short Term
Project.
1099
Siterra
uploads.
250 sites
pre
construction site
walked, Cloud
updates
for Verizon
LTE
build.
Identified
lease, zoning
and
access issues.
Communicated
with Landlord,
site
tech and
city
zoning/permits. Contracted
through
SkyHawk .
Field
Construction
Manager: SkyHawk Wireless - MyCom
North
America, Inc.
DSW .
10-20 09
start.
LEC/ETTCS
AT&T/Qwest
Engineers bringing Fiber into cell sites, P
re-construction site
walks
for ETTCS
start.
Coordinated
with
Qwest Engineers,
Landlord,
Sub-Contractors and
city
zoning/permits -
Site
Acquisition directions
for
Raw Land,
Co
locations, Vaults
and
Rooftops. I
Managed
construction time
line
crew scheduling,
NOC
trouble ticket
and
close-outs. Signed-
Red Line RFDS and Final CD/blueprints.
Civil
construction
from street
Pedestal
to cell
site
for fiber
DMARC
(NEMA-4).
To
include
concrete pad/construction
and
Cylinder Break- testing.
Site walks
for
OSP Design using MicroStation and AutoCAD preparing OSP construction drawings for permit submittals. Accurate detail drawings based on permitting ordinances, design inputs and sketches.
BOM
preparation
for Raw
Land,
Co Locations,
Roof
Tops and
Vaults.
BTS3901A
install/cutover,
telco, RF
and
DC power.
Coordinated
Sub-Contractors
for hire,
schedule s
and close-out
on
BTS swap
Huawei/Cricket
– Texas
Crew
development
and trained
3 rd
party
Vendors/GC-crews for
DC
power installs.
Andrew
connector training
and
alarm punch
down
schedule.
I Ran
Safety meetings
and
inspections. Responsible
for
delivering scope
of work and
objectives
identified on
a
scheduled timeline
updated
daily to
customer
war room
phone
conference.
Managed
100%
safety awareness
for
JSA site
access
and crane
operations.
Scheduled two
shifts
for project
completion.
Managed 36
crewmen
for two
shifts
overlapping maintenance
window.
Siterra
uploads,
MS project
tracking,
status reports
and
planning. Contracted
through
SkyHawk Wireless
, Short
Term
Project. 1099
Lead Climber :
Broken Arrow
Communications,
Albuquerque, NM
01/2004 – 10
/20 09
Cell
site
construction _NSB –
Antenna
and Lines,
distributed
antenna system
(DAS) .
Path Align-R
Microwave
and DragonWave
installs.
AT&T-
UMTS/GSM 2.0
install,
NOKIA WCDMA
–
BTS DC
■'a6Ericsson
– RBS
DC
Power install.
Fiber
Testing
with JDSU,
MP-60(Power)
and P5000
(Visual/Optic)
- power
meters,
optical test
equipment
Raw
land
cell site
builds
(concrete pad
and
pre fab
shelter),
tenant improvements,
stealth
sites, vaults
and
co locates.
Red Line RFDS and Final CD/blueprints.
COP,
Siterra
uploads, QA /
QC inspections
and
ATT002090502 (ND-51)
Third
Party Blind
Audits. Using AutoCAD.
Verizon
UMTS,
GSM, T1
(LOS)
Line of
Sight
pre-construction.
RET/Andrew/Powerwave
install.
Affordable
Mufflers
- Vista,
CA. 08/1999
– 08/2003
Owner
sole
proprietor –
Specialty welding,
custom exhaust
installs.
General
Auto
Inspection and
Repair,
Managed
3 auto
techs.
I was
lead
auto
tech, handled
my own
payroll/accounting
procedures,
Hired,
Fired and
kept
safety programs
Up
to
date.
Marina
Dive
Co., San
Diego,
CA. 05/1998 –
07/2004
Owner
sole
proprietor -
Underwater inspections and
repair.
Established
monthly in water
inspections,
I
employed -
3
two
man teams.
I
had
100% safety
at all
times
instilled
in crew,
handled
my
own
pay/accounting.
Conam
Inspections
- Wilmington,
CA 06/1995
– 03/1998
Level
II
inspector for
Ultrasonic,
liquid penetrate
and
magnetic particle
inspections
topside and
underwater.
E DUCATION
Champion Samurai Series RONIN I@II cell site on wheels COW March 2015
PIM
- Andrew/Comscope
Certified April
2014
OSHA30-
OSHA
30
Hour
Construction Industry
Outreach
Training,
no
expiration. Sept 2012
Anritsu -
Certified
Antenna
Cable sweep
and
Testing
/ Anritsu
Sitemaster
S331A,
S818A. May
2006
Andrew
-
Connector
Certification June
2005
Comtrain
-
Climb
Certified, Tower
and
Rescue –
LLC,
no
expiration. January
2005
College
of Oceaneering
–
Certification ; March
1995
Level
11
Inspections,
Ultrasonic Testing,
Magnetic
Particle
Testing, Liquid
Dye
Penetrate
Testing,
Last Resume Update | January 23, 2016 |
Address | Fallbrook |
![]() ![]() ![]() | |
Phone Number | ![]() ![]() ![]() |
Resume File | Philip-A.-Rivera-Resume-01.23.2016.rtf 197.89 kB |