April 2012 to March 2016
Painted cell towers,guyed wire change out,methodic protection on the anchor points,lighting system change
outs,microwave and 1 5/8 coax install plus weather proofing, tower de-construction. Have done microwave installs
in -25° weather. 25 foot 1 1/4 inch solid steel rod tower leg reinforcement, cross member reinforcement. I have done
some AT&T 1C&2C installs along with boom changeouts.

tower hand
irish tower - Sugar Land, TX
March 2013 to July 2013
Antenna and line plus cabinet de-instalation

Laborer
Best Quality Construction - Anna, IL
June 2009 to September 2011
Residential roofing,siding,remodeling.

Education

G.E.D.
edwards county high - Albion, IL

Certifications/Licenses

OSHA 10
November 2016 to Present

CPR/First Aid
November 2016 to November 2018

Last Resume Update June 24, 2018
E-mail lock Locked
Resume File richard-welty-2.pdf 6.31 kB

Contact Candidate

Login or purchase this resume contact details.