Certified Tower Climber 2
  1. I been a tower dawg for almost 3 yrs done all at&t from 1c install to upgrades to 5c installs and maintain and troubleshoots and Verizon new builds of AWS and LTE 850 and 1900 and 2100 and hybrid lines and radio install to maintain and troubleshooting and T Mobile new builds and upgrades and 4g ruale area cubits install and attenna swaps for everything and some tower erected and boom swaps and been doing construction and ran heavy equipment for 5 yrs. I was also a squad leader in the Army for 8 yrs with 2 deployment under my belt for OIF and OEF.

 

Military Experience
● United States Army/Iraq/Afghanistan E-5 Squad leader ​Mar. 2004 – Mar. 2012
● Responsible for planning and supervising the training of 15 soldiers, to ensure
the units’ combat readiness
● Accountable for soldiers in the squad and their equipment
● Responsibility for the maintenance of squad-assigned weapons and ammunition
● Submitted requisitions for logistics (supply) and most other items needed to support the
squad
● Built training ranges such as ITTT Range in Liberty City and Hand Grenade Range in
Freedom City accommodating 40,000 soldiers/year

 

Last Resume Update April 14, 2017
Address Cookeville
E-mail lock Locked
Phone Number lock Locked
Resume File PG2K.pdf 199.95 kB
Spanish Speaking? No
Willing to Relocate? Yes
Years Experience 3 years

Experience

Project Group 2000
Top Han
Jan 2016 - Dec 2016

Work Experience
Project Group 2000 ​ Jan. 2016-Dec. 2016
Tower Hand 2 Top Hand
● Verizon new site build outs and upgrades for 850 and 1900 LTE and AWS antennas and radios
and hung new pipe and color code and made jumpers,grounds and bust bars TMA replaced and
Hybrid lines and OVP installed in selter and on tower and wired and final pictures
● Relamps and replacements of lighting systems for AT&T
● Black & Vetch AT&T builds installs and upgrades for 1C,2C,3C,4C,5C and antennas and boom
swaps and DC power wires and Fibers and OVP old ones and new installed and wired
● AT&T Trouble Shoots and Maintains tiger teams
● T Mobile Tower erection and complete new site builds for the new low bands and LTE systems

PJS tower service
Tower hand 2
Oct 2014 - Dec 2015

PJS Tower Service​ ​Oct.2014-Dec.2015
Tower Hand
● T Mobile-Install Cabinets and radios and TMA swaps and antennas
● AT&T-Fly and install new antennas with 700 and 1900 and 2100 radios
● Sprint-Updates and maintains
● Climb and rig blocks and ropes for build outs up to and over 500 ft

Weigand
Tower hand
Jun 2014 - Oct 2014

Weigand​ ​ ​ ​Jun2014-Oct 2014
Tower Hand
● At&t new build outs
● Hung and flew antennas and radios 700 and 1900 and 2100
● Color code

Contact Candidate

Login or purchase this resume contact details.