10/16- present Tech Contractor/Yorktel
Install computer work stations and racks. Install speakers, WAP’s, microphones and motion sensors in T-Bar environment. Run fiber. Run and terminate Cat5e, Cat6a. Install up to 98” TV’s, TV mounts.
1/16 – 10/16 Level 4 Lead Outsource
Install MDF/IDF ladder racks, cabinets, patch panels, switches, wire management. Run and terminate Cat5/6 at patch panels (110/66 blocks), wall jacks. Test end to end. Install WAP’s (wireless access points) Install DAS. (Distributed antenna systems) Install RAUs. Run terminate LDF4, Trilogy and JMA, DIN connectors. Install Access point.

7/15 – 12-15 Level 4 team Lead Midwest Underground Technologies Inc. (MUTI)
Install DC power plants in Comcast Head End environment. Alpha, Emerson, Com Net. Write SMOP’s. Survey and order BOM’s Create close out documents.

7/13 – 8-14 Team Lead Unicom Inc. / Contractor
Engineer 17 site specific drawings, create bill of materials. DC power plant upgrades in Okinawa Japan. Replace old DC power plant with C&D Sageon III. Hot cut existing equipment to new power plant. Install new C&D AT-19/29P battery banks. Perform power study site survey for cell site power upgrades. Determine HVAC viability, AC/DC power viability and recommend upgrades as necessary.
11/12 – 7-13 Lead Installer/Integrator TNS / Quanta Wireless / Contractor
Install RBS 6601 DUWs DULs. Install RRUs, RUs, FUs. Install SAU and alarm cables. Integrate DUWs and DULs. Call test and NEA test

11/10 – 11/12 Lead Installer Mycom / Contractor
Install/provision DUW/L/G 30, Install DAS, Fujitsu Flashwave 7120 with Netsmart. Test LAPD Ring 30 nodes w /JDSU 6000A TBERD. Install Adtran MX2800 MUX/w patch panel. Extend, terminate and test DS3 circuits (DS3 tester JDSU 3000). Extend and test T1 Circuits utilizing T1 testers, (Fluke and JDSU 3000). Extend and test T1s through multiple microwave hops. Provision tributaries between microwave hops. (Alcatel 9500, Harris, MIX56) Troubles shoot T1s and DS3’s

6/09 – 11/10 Lead Installer Swift Ind. Power / Contractor
Install Ericson/Argus/Eltek power plants in cell sites. Install Ericson 3206, 3106, 6201, 6201, 6601, 6602, Ericson RRU, LMU, BiasT’s, and Adtran MX2800. All related terminations, i.e.…LDF4, Cat5/6, Power, and T1 extensions. Extend T1 circuits through Microwave hops. Install RXAIT’s, dual Duplexers, Diplexers and Triplexers. Remove and install Batteries. Integrate 6000 series Ericson. Sweep test RF cables utilizing Anritsu test equipment.T1 test utilizing Fluke Quick Bert tester / JDSU HST-3000 testers. Battery resistance test utilizing Meggar test set or Midtronic’s test set. Complete of all sign off paperwork.

1/09 – 6/09 Lead Installer Nortel / Contractor
Install MFRM 2, MFRM3 Radios. Integration of MFRM 2/3 Radios and DOM’s utilizing Vortex and HyperTerminal programs. Run terminate RF Coaxial cable. Run Terminate power.T1’s T1 testing. Install DOM, TIIM, EDCG’s. Run and terminate fiber.

4/08 – 1/09 Level 4 Site Supervisor General Data Tech
Survey Verizon wireless sites for installation and up grades of Cisco 6509/6513/CRX/10K and 12K switches.
Order all parts necessary (Bill of materials, BOMS) for installations and upgrades to listed switches. Install listed Cisco switches.
Install and test fiber optic cables. Install Cat6 console cables. Upgrade and swing circuits from old equipment to new.
Decommission old equipment. Write MOPS, perform final walk thru and sign offs.

8/06 – 4/08 Level 4 Site Supervisor Tyco Electronics/Lineage Power
Supervised 2-3 5 man crews. Install 10,000 AMP power plants. Install batteries. Read & understand blue prints and spec sheets.
Generate MOP's, JSA's, As Built drawings. Run and terminate various sized power cable. Run and terminate alarm cables.
Program BDFB controllers and rectifiers.

5/05 - 8/06 Contractor Tyco, PCC, JH Bryant, Teldata,
Install BDFB's, rectifiers, batteries, battery containments. Hot swap of batteries.
Hot terminations 750, 500, 350 cables utilizing Burndy and Husky crimpers and insulated tools.
Use Hydraulic punch. Lacing, install fire stop. H-tap and Ground installation
Terminate alarms. P-touch labeling. Battery testing. Battery strapping. Earthquake bracing
All skills are carried forward from Supervisor position With Fujitsu

4/02 – 5/05 Dedicated Tech Source One Network Solutions / Contractor
Maintain and service 25 Office Depot Stores. Duties Included, installation of IBM registers,
Computers, Lexmark Printers Cisco routers, switches and wireless access points. Cabling and termination of
CAT5. Maintain and troubleshoot LAN/WAN networks. Maintain and troubleshoot PBX phone
Systems and DSL circuits. Software upgrades. Perform MAC (moves, adds, changes)

11/99 - 4/02 Level 4 Lead Installer / Supervisor Fujitsu Network Communications
Supervised and assisted installation crews in the installation of central office telecommunication equipment. Familiar with installation practices of most telecom providers.
I.e. AT&T, SBC, Verizon, ASI, ADC, Qwest, Cricket, T-Mobil, Sprint

SKILLS
JDSU T-BERD 6000A Tester
JDSU HST-3000 Tester T1/T3 (T1, DS3 and Fiber testing)
Anritsu Site Master S331D
LTE RBS 6000. Installation and Integration Certification.
Integration of Nortel BTS, MFRM2/3, DOM’s
Integration of Alcatel 9500 and Harris Microwaves
Familiar with Cisco routers and switches (HyperTerminal, putty)
Fluke Quick Bert T1 tester
Own most of the necessary tools. Punch down, wire wrap, crimpers, all basic hand tools.
Run and terminate Trilogy coax with JMA compression connectors.
Run and terminate RF Coaxial cable. Super flex and LDF4.
Run and terminate 25, 50, 100+ pair cable i.e.66 block, 110 blocks.
Run and connect pre terminated Fiber. Inside and outside plant pulls.
734, 735 BNC coax terminations, RG6, RG59 coax terminations.
CAT5/6 cabling and terminations 568A, 568B
RJ11 and RJ45 terminations
Color code
DC power
BDFB and Most VLA and VRLA Batteries
DS1 wire wrapping
Multi meters, cable testers
Midtronics battery tester and records
Meggar Tester and records
Load test and records

REFERENCES (you may contact all)

Jason Collinsxxx-xxx-xxxx Tyco
Josh Cookxxx-xxx-xxxx Swift Industrial Power
Ryan Chaleffxxx-xxx-xxxx Straightline Business Machines

Last Resume Update January 19, 2017
Address Long Beach
E-mail lock Locked
Phone Number lock Locked
Resume File Robert-Black-Resume-01.16.17-rev.-O.doc 57 kB

Contact Candidate

Login or purchase this resume contact details.