• Test sites
• Fix whatever issue is
Pine Matrix Feb. 2015 - Oct. 2015
• 1,C and 2,C installs
• Troubleshoot sites / test sites
• T arm installs and decoms
• Beef ups
• PIM and sweep sites
Vinculums Sept. 2012 - Dec. 2014
Tower Tech 1
• Install antennas and lines
• Troubleshoot sites / test sites
• Beef up towers
• Decom lines and antennas
• Shelter work
• Grounding on tower and ground
• Rigging tower
LEC Oilfield Services Aug. 2008 - Sept. 2012
Flow Tester
• Inspect flowback hookup
• Opening well to manifold and chokes
• Record pressures and volumes
• Igniting flare stacks
• Shutting in wells
• Hazard assessment
• Training of new employees
Central Distributing Apr. 2007 - Aug. 2008
Forklift Operator
• Loading and unloading of product
• Stocking warehouse
• Maintaining forklifts
C-4 Roofing May 1999 - Mar. 2007
Owner/Operator
•All aspects of Duro-Last membrane roofing
• Hiring and training of employees
• Job site prep
• Welding with heat gun
• Job site completion
Ryan Roofing May 1997 - Apr. 1999
General Laborer
• Basic jobsite labor
• Installation of Duro-Last membrane
• Cleaning up jobsite

Levi Lowery Cody Popejoy Lance Pattison
RPS Oilfield Services LEC Oilfield Services Pine Matrix
Flow Tester Site Manager Co-Owner

REFERENCES xxx-xxx-xxxx xxx-xxx-xxxx xxx-xxx-xxxx

Jeff Brady Kyle Pond
WPX Energy Direct TV
Company man Install Specialist
xxx-xxx-xxxx xxx-xxx-xxxx

Last Resume Update January 16, 2016
E-mail lock Locked
Phone Number lock Locked
Resume File carrell_sabin.pdf 39.25 kB

Contact Candidate

Login or purchase this resume contact details.