Planning and Development
OSHA Regulatory Compliance
Integration, Implementation and Testing Experience

Acquisition, Permitting and Engineering

Lease Space Requirements, Right-of-way, RAD Center, HVF, Mount and Structural Analysis, Mount Mapping, Mount Modifications

Alarm Troubleshooting

Site Surveys/Walks

JSAs, JHA Compilation

Tear Outs/Decommissioning

MOP & SOW Comprehension and Creation

Hot/Cold Slides and Elimination of Slides
Earthquake Bracing and Fire-Stopping
NTP, RFQ, FPP, CO, PO, BIC
Project and Site Specific Bidding
COE, COW, MITSO, MW, DAS, CNS, Fiber and Wireless Construction (rooftops, private LL, special venue, government, indoor/outdoor sites)
Leasing and Permitting
OSP, ISP, Cell Sites, Switch, Central Office
Training

EPA 608 Type I Ceritficate
AT&T Ask Yourself
AT&T TP76300
AT&T EJF
Sprint Spark (2.5GHz)
Sprint Network Vision (1900MHZ, 800MHz, 65MHz)

CPR/First Aid
Quality Assessment
Microsoft Excel
HILTI & 3M Fire Stop
OSHA, 10-hour & 30-hour
T-Mobile Greenfield

Software Experience

AutoCAD – Working knowledge
MS Project – Working knowledge
Adobe Acrobat Pro - Advanced
MS Office Suite - Advanced
MS Excel- Advanced, including pivot tables and vlookups
CAM - Advanced
Site Handler - Advanced

Siterra - Advanced
Stone Crop – Working knowledge
Concur – Working knowledge
Oracle – Working knowledge
Knowles – Working knowledge
Replicon – Working knowledge
SweepMasters – Advanced

Equipment Knowledge
Multiple Carrier Base Station Radio; AAV Circuiting; NID; T1; Cisco Routers; Flashwave 7500, 4500, 4300, 4100; DSlam; 15454; Symetricom Clock; Juniper; Sun Systems; FOT panels; Telect Fuse panels; Hendry Fuse panels; UMTS; BDFB; MDF; IDF; HDF; 5ESS; Litespan 2000, 2012; DSX-1, 3; Alarm Blocks; D4 Channel Banks; Calix C7, E7; Tellabs Titan 532L, 5500; DISCS; POTS Splitter; DACS; OC3; OC12, 48, 192; ADC Repeater Shelf; DMS 10, 150, 250, 500; Nortel Magellan, GSM; DWDM; Stinger Shelf; IS9008; CAT 3, 5, 6 Networking; DMXTEND; FLM 150, 1100, 2400HS; GPS; Purcell; Ciena; Windstream Cube; BTS; RBS 3031, 6102; BBS, PBC 6200; Ground and Tower Mounted RRU Solutions; Antennas; Microwave; RF Systems; DAS and oDAS;

Shay A. Berry Resume Page 2

Professional Experience

Windstream Little Rock, AR November 2016-Present Contract Engineering Coordinator
Review and entry of engineering surveys and quotes for pole expansion and construction.

Prince Street Storage Center Conway, AR July 2016-Present Part-Time Residential Manager
Daily maintenance activities including landscaping, roll-up door repair, light electrical and plumbing, turnover cleaning of units; daily office procedures including renting units, keeping accurate notes and records, payment processing and allocation.

MGA Cincinnati, OH July 2016-August 2016
Technician
Performing installation of Cisco X1070, Sun Microsystems Netra X4250, Alcatel Lucent Advanced TCA, SRX5800, MLXE 32, fuse panels for Verizon Central Office upgrade. Position also included reviewing/redlining CD’s, RFDS, MOP, Structural and Mount Analysis, site surveys, engineering and bid walks.

Procomm Various Locations February 2016-July 2016
Technician
Performing installation of TMO ARG 9201, AR 10, fuse panels for Central Office upgrade. Position also includes reviewing/redlining CD’s, RFDS, MOP, Structural and Mount Analysis, site surveys, engineering and bid walks.

Techforce Miami, FL January 2016-February 2016
Technician
Performed field swaps for TMO 10ghz project. Moving fibers in Alcatel-Lucent 7210 1ghz SFP to newly installed 10ghz SFP. Mounted and installed new battery cabinets/casing into Miami Data Vault for battery upgrade.

Retel Services Orlando, FL June 2015-Sep 2015
Construction Manager
Manage and coordinate delivery of construction milestones to customer regarding installation of T-Mobile Greenfield project. Field labor when necessary to complete construction on new site builds, including MMP and AAV installation, power meters, BTS and battery backup systems. Manage tower construction of L700 and 1900, wave guides, tower lights, radios, antennas, hybrid cables. Right-of-way and lease space assurance including BIC reading and negotiations. Responsibility for building and electrical permit opening and closure. Deliverable, budget and logistics accountability and responsibility.

Mastec Orlando, FL January 2015-May 2015
Project Manager
Managed civil and tower crews during multi-million dollar build out for Sprint in North and Central Florida. Job duties included scheduling, tracking, budgeting and reporting daily status/updates to customer. Insurance of safety and quality standard compliance. Material ordering and inventory management including occasional delivery of spare or replacement equipment.

Shay A. Berry Resume Page 3

Goodman Networks Orlando, FL August 2014-January 2015
Construction Manager II
Manage and coordinate delivery of construction milestones to customer regarding installation of Sprint Spark 2.5GHz project. Audit and verify Sprint Network Vision, 65MHz, 800MHz and 2.5GHz installations in accordance with MOP and Sprint standards. Perform bid walks, pre-construction walks with A&E firms and contractors. Responsible for permitting including electrical and building. Review of close-out packages, bids/quotes for each site, redline CD’s, RFDS, BOM’s and SA’s. Management of material orders and delivery through Excel with pivot tables and vlookups. Ordering and disbursement of CSM tickets for all of the North Florida market sites to managers and contractors. Manage and coordinate NSN crews for cabinet installation/on air delivery to customer for final acceptance. Major Accomplishment: successful construction completion of 60+ sites as of December 2014.

Avion (Contracted to Ericsson) Jacksonville, FL August 2012-August 2014
Construction Manager II for Jacksonville/Gulf Coast
Management and coordination of all construction aspects of wireless base stations regarding installation of Sprint Network Vision CMDA, LTE, 65MHz, and 800MHz, Driver pricing, site specific quote, and change order verification. Safety and quality assurance. Review/approval of mount and structural analysis, mount mapping, RFDS, CDs, and close-out-packages. Review and acceptance/rejection of sweeps and fiber testing in SweepMasters. Review building permit issuance accuracy from application to final inspection, or initiate change of contractor to ensure successful BP closure. Safety policies and compliance insurance. Personal on-site installation if necessary. Create trustworthy report with vendors, contractors, and customer to ensure proper installation of tower and ground equipment including Telco equipment, Cisco 901, RF and antenna equipment. Responsibility for open and closure of permitting including electrical and building. Advanced use of MS Excel, including tracking using pivot tables and vlookups. Upper level project and program management contact and collaboration. Right-of-way assurance and negotiation. BIC reading and lease assurance. Evaluation and auditing of market construction managers, acting as the technical go-to for site issues affecting integration. Major Accomplishment: successful delivery of all milestone quarterly projected goals during eight consecutive quarters on time and under budget. Managed 6 Ericsson CM’s and 8 individual GC companies with multiple crews in both markets, as well as, tiger teams in both markets.

Glotel Raleigh, NC May 2011-March 2012
Lead Field Tech
Performed all relative duties regarding FTTH/ETTH project for Mastec, May 2012 to Jan 2013, and NSORO from Jan 2013 to March 2013. Performed site walks with BH vendor engineers to assure accurate and acceptable delivery of equipment from carrier lease space to BH vendor location. On site duties included daily field reports, JSAs, BIC interpretation, SOW’s, MOP’s and assurance of crew understanding/compliance with all leasing and construction documentation for construction of equipment. Equipment installs included AT&T Ciena, Century Link Purcell, NEMA cabinets and Windstream Cube. Material installs included underground conduit with mule tape from fiber provider location/MMP to carrier NEMA/PPC, H-frame design and construction, run and termination power, cad welds, applying mechanical or crimped lugs for grounding to all cabinets/equipment. Worked as tiger team lead to perform cleanup of site quality for handoff to carrier. Assisted with site acquisition and engineering of site delivery from BH provider to carrier location. Major Accomplishment: lead of only installation crew ever under direct contract to NSORO. Successful handoff of 400+ punch free and under budget sites to Mastec for handoff to carrier.

Alliance SDS Louisville, KY December 2010-May 2011
Lead Technician
Performed AT&T 2C/3C upgrade of UMTS system. Pulled and closed building/electrical permits for installations of cell site work to be performed for client. Performed utility surveys for aerial and underground installations for AT&T delivery to site.

Shay A. Berry Resume Page 4

Techforce (Contracted to Telamon) Indianapolis, IN May 2010-December 2010
Lead Technician
CO spec and floor plan interpretation. On-site engineering. Bay mounting. Installation of rack, lighting, top supports, AC/DC power, fiber duct, timing, alarm blocks, clocks, external GPS cone and antennas. Power cuts. AT&T site specific testing and folder documentation. Stenciling and labeling to AT&T standards. MOP and SOW creation. Major Accomplishment: lead of 4-5 man crews on 100+ sites with zero punch item average over 7month period. All sites delivered ahead of time and under budget for allotted site.

CommLink Durham, NC October 2009-May 2010
Project Manager
Managed 16crews on 500+ sites. Job duties included scheduling, tracking, budgeting and reporting daily status/updates to customer. Insurance of safety and quality standard compliance. Assignments also consisted of assurance that GC construction managers/lead technicians performed the tasks of installing timing, alarm, and clock cabling, external GPS equipment, cosmic/main frame wire wrapping/amphenol application, Calix C7, UMTS and GSM upgrades/provisioning/migration were performed/completed correctly and in a timely manner for handoff to carrier. Material ordering and inventory management including occasional delivery of spare or replacement equipment. Major Accomplishment: successful handoff off 500+ sites to carrier on time and under budget.

PK Diversified Group (Contractor for Emerson Power) Cleveland, OH September 2008-October 2009
Technician
On-site engineering. Installation of bays/top support, three tier ladder rack/fiber duct, rectifiers, bus duct, BDFBs, PDUs, PDCBBs, Vortex/Lorrain power systems, Telect/Hendry fuse panels. Complete removal and installation of battery strings. Labeling and stenciling. Hot slides and power cuts. Major Accomplishment: worked on 200+ sites that were delivered punch free, on time and under budget to Emerson for handoff to carrier.

Trinity Telecomm Cleveland, OH March 2006-September 2008
Project Manager
Managed 8crews on 1100+ sites. Duties included delivery of successful power cuts on +24V and -48V power plants, hot-slides, installation of CDMA and removal of WCDMA equipment. Site specific engineering and material ordering/delivery. Creation of MOPs and SMOPs for work to be performed in field by crews. Assurance of safety and quality standard compliance. Tracker creation for use of company records and reporting. Major Accomplishment: delivery of 1100+ sites on time and under budget to carrier.

Tyco Power Nashville, TN October 2005-Febuary 2006
Technician
Complete installation and removal of wet/dry cell batteries. Installation of rectifiers, BDFBs, PDCs, and PDUs. Major Accomplishment: worked on the biggest project in Tyco power history to date in Nashville, TN.

TXI South Bend, IN Jan 2002-August 2005
Project Manager
Responsible for scheduling, equipment delivery and tracking for all milestones. Upper-level communication including meeting management with carrier. Management of 5crews serving North IN market on over 600+ sites and 12crews in Indianapolis, IN market on over 1100+ sites. Creation of MOPs, SOWs and SMOPs. On-site engineering. Supervision of field supervisors on installation of ladder rack/fiber duct, multiple types of equipment, labeling/stenciling, power/grounding, safety/quality and timely delivery of milestones to carrier. Major Accomplishment: successfully ran markets without missing dates for over 3yr span.

Shay A. Berry Resume Page 5

Mastec Newark, NJ May 2000-November 2001
Lead Technician
Supervised six-man crew. Mounted and top supported bays. Installation of Lucent equipment, power cabling/grounding, timing, alarm blocks, GPS and clocks. Labeling and stenciling. Major Accomplishment: worked on initial job for Mastec into CO installation side of industry.

Tad Telecom Ft. Lauderdale, FL October 1996-January 2000
Lead Technician
Mounted and top supported bays. Installation of ladder rack/fiber duct, power cabling/grounding, timing/GPS/clocks, alarm cabling/blocks, wire wrapping, soldering BNC connectors, application of LC, SC, ST fiber connectors, OC-3, 48 systems, worked on 5ESS switch and Fujitsu FLM 150, 1100 systems. Major Accomplishment: promotion to Lead Technician within six months.

Reltec Columbia, SC June 1995-October 1996
Technician
Ran, supported, labeled and terminated CAT5 cabling from telco room to permanent 110 patch panels in Walmart and various hospitals.

References
Patrick Morton, Construction Manager III, Ericsson, Jacksonville/Gulf Coast,xxx-xxx-xxxx, xxx@xxx.com
Susan Nix, Private Landlord, Orlando,xxx-xxx-xxxx
Jason Schwartz, Construction Manager II, Ericsson, Plano,xxx-xxx-xxxx Office,xxx-xxx-xxxx Cell, xxx@xxx.com

Last Resume Update December 29, 2016
Address Conway
E-mail lock Locked
Phone Number lock Locked
Resume File Shay-Berry-Resume.docx 28.74 kB

Contact Candidate

Login or purchase this resume contact details.