
Erecting tower from ground up.
Assembled steel into structure & set steel using Boom Truck, Gin Pole & Cranes.
Able to read blueprints for assembly of structure.
Rigging units for erections.
Demolition of Tower (tare down).
Erected a few Monopoles.
Tower Site Safety Audits – Placed angles on weak/bent angles to support future/existing carriers material.
Replace Antenna Booms & Platforms, setting to Degree`s as figured.
Replaced Guy-wire, wave guides and Safety Climbers.
Changed cross beams on self-supporters.
Changed out Bolts and Loose Nuts.
Removed snap-ins from Towers.
Removed old coaxial lines.
Installed marker lights (top strobe) & side lights.
Replaced strobe/sidelight bulbs.
Replaced wiring for lights.
Applied Diverters to guy-wires on Towers (Bird Shewers) around Bird Sanctuaries.
Grounded Towers.
- Evangelista Roofing – Titusville, FL 32780 – 2004-2014
Customer oriented home town roofer specializing in residential and commercial new roofs, re-roofs and repairs in Brevard County Florida.
ROOFER / LABORER
Fiberglass / Asphalt Bald Top & Gravel.
Paint / Silver Coat Bald Top Roofs.
Architectural / 3 Tab Shingle Roofs.
Tar Kettle Operator.
- Fun Size Group – Titusville, FL 32780 – 2010-2014
One of the largest scrap metal-recycling companies in Northern Brevard County Florida.
LEAD RECYCLER
Responsible for the collection, cleaning and tear down of metals. Over saw 2 junior employees. Tasked with financial records and daily revenue logs.
PERSONAL
Last Resume Update | February 6, 2015 |
Address | Titusville |
![]() | |
Phone Number | ![]() |
Resume File | Trueax_Tower_Resume.pdf 26.35 kB |
Spanish Speaking? | No |
Willing to Relocate? | Yes |
Years Experience | 4 |
Experience
Tower Climber
Tower maintenance.
Erecting tower from ground up.
Assembled steel into structure & set steel using Boom Truck, Gin Pole & Cranes.
Able to read blueprints for assembly of structure.
Rigging units for erections.
Demolition of Tower (tare down).
Erected a few Monopoles.
Tower Site Safety Audits – Placed angles on weak/bent angles to support future/existing carriers material.
Replace Antenna Booms & Platforms, setting to Degree`s as figured.
Replaced Guy-wire, wave guides and Safety Climbers.
Changed cross beams on self-supporters.
Changed out Bolts and Loose Nuts.
Removed snap-ins from Towers.
Removed old coaxial lines.
Installed marker lights (top strobe) & side lights.
Replaced strobe/sidelight bulbs.
Replaced wiring for lights.
Applied Diverters to guy-wires on Towers (Bird Shewers) around Bird Sanctuaries.
Grounded Towers.