• Management of lump sum and reimbursable engineering projects for conceptual study,
FEED, detailed engineering and EPCM projects.
• Leadership experience in multi-million dollar projects.
• Lead team of engineers, supervisors, inspectors, and technicians.
• Design of piping and pressure vessels as per International Standards especially ASME
B31.1 & B31.3, and ASME Section VIII.
• Review of design and drawings prepared by contractors as per International Standards
ASME, API, ASTM, SAE, BS, BP-GS, DIN, Shell, and TRD.
• HAZOP study prior to start of projects.
• Liaison with clients, consultants, contractors, vendors, and suppliers for smooth running
of engineering and construction projects.
• Coordination with other departments of clients especially Operations and Maintenance.
• Carrying out progress monitoring and reporting of engineering and construction projects.
• Commissioning of EPC projects including handing over of products to clients.

Over 20 years of experience through a variety of roles from construction engineer, discipline
engineer, project engineer, construction manager, and project manager.

ADCO – Abu Dhabi, United Arab Emirates 2015 - 2016
Mott MacDonald – UK, Abu Dhabi - PMC
(Seconded to ADCO –PMT ), EPC – ALSA Engineering, Abu Dhabi,
Title: Construction Manager
• Liaised with PMT, EPC, Sub - contractors, vendors and covering all technical related
issues from initial enquiry to commissioning
AKHLAQ AHMAD SIDDIQUI
4912 Spring Hill Dr., Wichita Falls, TX 76310-USA
xxx-xxx-xxxx xxx@xxx.com

• Supervised EPC contractor as PMC in construction and maintenance activities (during
plant shutdown) in brown/green field and execution of the works respectively according
to the drawing and specification
• Maintained the quality & workability of concrete with reinforcement works as well as
fabrication / erection of steel structural works at site
• Monitor the functioning of the EPC Contractor to ensure that the design is effectively
carried through in to fabrication and construction
• Monitor, implementation of project quality systems, ensure preparation and approval of
Inspection and test Plans, follow-up issuance of non-conformance reports and timely
close out
• Ensured the HSE aspects of the project during construction, installation, pre-
commissioning, commissioning activities are always promoted to first priority and
demonstrated management commitment to HSE reporting and compliance
• Taught engineering and high school courses along with research work.

ADGAS – Abu Dhabi, UAE 2007 - 2015
Project: Integrated Gas Development and Offshore Associated Gas on Onshore &
Offshore, Das Island- UAE
PMC- Worley Parsons, EPC - HYUNDAI, Korea
Title: Senior Construction Engineer
• Scope of work for IGD/OAG includes project management, engineering design,
procurement and construction with commissioning of Inlet receiving and separation
facilities, dehydration trains, compression trains, fuel gas treating plant, compressed Air
package, Nitrogen pkg drains, Flare includes closed drain and new offshore HP and LP
flares and trestle,

DESCON Engineering Company, Abu Dhabi, UAE
Title: Project Manager 2003 - 2007
Descon engineering is project-oriented and client driven company. The company is unique in its
resources base with in-house capabilities for design engineering, manufacturing, and
construction and maintenance services. These are applicable to a wide variety of projects
AKHLAQ AHMAD SIDDIQUI
4912 Spring Hill Dr., Wichita Falls, TX 76310-USA
xxx-xxx-xxxx xxx@xxx.com

related to industrial plants. Project management expertise vested through sophisticated IT
based systems is one of the key elements to achieving successful result of projects

FARRIS Engineering, Brantford Ont., Canada 2000– 2002
Projects Coordinator
(Canada division of Curtis - Wright Flow Control Corporation.)
Farris is a recognized leader in the hydrocarbon processing, refinery, petrochemical, natural gas
production and transmission, pharmaceutical, and general processing industries worldwide. A
pioneer in the field, Farris Engineering created many products that remain industry standards.
Integrating its core hardware technology with the information age, Farris originated computer
software to assist customers in the sizing and selection of valves. A recent reorganization of
manufacturing plants and processes maximized production effectiveness to position the
business unit at the forefront of the industry, with service and delivery second to none

TENNESSEE State University, Nashville, TN – USA 1996 – 1999
Title: Research Assistant /student
• M.E- Master of Engineering, Major-Engineering incl; dynam/therm comp fluid flow,
principles of design, optim method of engineering design, vibration analysis, conv heat
transfer, numerical methods engr, introduction to manufacturing engineer, flexible
manufacturing system, predictive /preventive maintenance, prod & oper management
and thesis on
• Melting of solid particles in a fluid under microgravity.
• Developed a system for heat transfer by using glass module as per specification for
publication & thesis under microgravity condition
• Developed a practical method that is able to qualify both spatially and temporally the
microscopic geometry of the melting particles using optical and infrared imaging
technique and fractal analysis.
• Developed a new experimental apparatus temporarily named particle melting in fluid
testing module, which provide results of temperature distribution, particle distributions,
surface area quantification and melting front visualization.
AKHLAQ AHMAD SIDDIQUI
4912 Spring Hill Dr., Wichita Falls, TX 76310-USA
xxx-xxx-xxxx xxx@xxx.com

EDTI Engineering, Inc., Corona, CA - USA 1998 – 1998

Title: Project Engineer
An Engineered Systems Company; the Oil, Gas, and Petrochemical Industries owe their
existence to the basic processes of Vapor Recovery, Liquefaction, Gas Compression, and
Refrigeration. KEC expertise is in the understanding of, and experience with these processes as
related to the gases involved, and the ability to design and manufacture engineered systems to
safely and efficiently accommodate these requirements).
• Engineering and design of oil flooded rotary screw compressor system with dual oil
pump for the compression of PSA Feed/ Tail Gas.
• Supervision and coordination of detailed engineering carried out by the team of 6
• Created P&ID drawings and documentation inspected & checked fabrication and bill of
material.
• Prepared project reports, planning and scheduling, utilizing Microsoft Project
• Start-ups and operating training for refrigeration systems equipment commissioning,
• Completed projects within budget on time
• Inputs to develop quality documentation and updated it regularly, incorporated new
changes and reported to management. Prepare material requisitions and technical bid
evaluations.
• Facilitated all phases of production including manufacturing, purchasing and new
product development to assure proper selection of suppliers.
• Identified and recommend new processes and equipment that have a positive impact on
service
DESCON Engineering Company- Pakistan 1993 – 1996
Project: Kadanwari Gas Field Development, Sind-Pakistan
PMC: LASMO – USA, EPC: Foster Wheeler, Australia
Title: Planning Engineer
• Project planning, scheduling, progress monitoring, reporting, variance analysis and
contracts management function.
• Ensure Planning & FEDC is a strategic tool for controlling construction activity and
related operating efficiency of plant and personnel.
AKHLAQ AHMAD SIDDIQUI
4912 Spring Hill Dr., Wichita Falls, TX 76310-USA
xxx-xxx-xxxx xxx@xxx.com

• Revisited level III plan prepared at the bidding stage, after award of contract, in close
coordination with project manager and site manager
M & J Engineering, Karachi - Pakistan 1989 – 1993
Title: Project Engineer
M&J is projects oriented and dynamic small size organization, involved in fabrication of steel
structure, pipe spools, various steel components including fabrication of Heat exchangers,
ducts, chutes, belt conveyors, screw conveyors, elbows, transition pieces

Academic Qualification
• M.E- Master of Engineering, Mechanical, TSU- Nashville, TN 1999
• B.E –Bachelor of Engineering, Mechanical, NED University- Karachi Pakistan 1989
Computer Skills - Extensive Knowledge in;
• Micro Soft Office
• CATIA V5.7, Pro/E, and AutoCAD
• Microsoft Project, Primavera
• ASME Sec III & VIII, Div. 1, ANSI, API
Professional Training Certificates & Membership
• PMI – member of Project Management Institute
• RSES Membership – The HVACR Training Authority
• Managing Safely - in Aug. 2003 from The Institution of Occupational Safety & Health in
Association with National Construction College-UK
• Advance Incident Investigation in March 2005 from Excellence Risk Management
Consultancy
• Human Resources Management Skills in December. 2005, Spearhead Training - UAE
• Emotional Intelligence in Sept. 2005, Spearhead Training - UAE
• CATIA V4 / V5 Comprehensive in MAY 2002, Maverick Solutions Inc. Toronto- Canada
• Professional Training on Primavera Project Planner, MS Project, Win BID, PMS -1994
• Eligible for Professional Engineering License. - Ontario Canada – 2000

Reference: Available upon request

Last Resume Update August 25, 2016
Address Wichita Falls
E-mail lock Locked
Phone Number lock Locked
Resume File AKH-resume2016-.pdf 91.77 kB

Contact Candidate

Login or purchase this resume contact details.