set in front of me. Also I'm a comtrained authorized climber & rescuer. Done
mostly AT&T LTE upgrade work and some GSM upgrade. I have been done
Sprint 2.5 upgrade. Also I have been installing Verizon AWS shelter
equipment and integration for the past year. I’ve also currently did
troubleshooting and maintenance work for AT&T.

Experience and Training Includes
♣ Installing GRC, IMC, EMT, Rob Roy, and PVC. Conduit {½”/¾”/1”/1 ½”/2”/2
½”/3”/3 ½”/4”/and 4 ½”}

♣ Installing Cable Tray {12”/18”/24”/36”}

♣ Installing Duct Banks

♣ Installing Grid Grounding

♣ Installing Switchgear, Panels, Transformers {All Sizes}, Bus Duct, and
Lighting, Receptacles, etc.

♣ Pulling Cable #14/#12/#10/#8/#6/1/0,2/0,3/0,4/0,500,750,
3c350,3c500,3c750,500(5.8kv shielded),750(5.8kv shielded)
Heat trace, Fiber optic cable, and shielded cables from single pair all the way
to 36 pair etc.

♣ Installing Temporary Power

1 Installing LTE antennas and GSM antennas

2 Wiring and powering up Raycap
3 Rigged tower and also flew antennas with experience running capstan

4 Ran hybird cable, set hoisting grips and terminated it in1900&800 RRUs and
MMSB

5 Sweep lines using Anritsu gear also color coding jumpers and making new
jumpers.

6 Install booms and microwaves

7 Worked with Kaelus pim gear to find distance to pim

8 Checked weatherproofing, replaced jumpers, swap out sectors using csr and
also old fiber rolls with new ones.

9 Install Enb Cabinets for version, Ran Power and grounded cabinet.

10 Install (DUS,PDU,PSU) for AWS and installed racks for rack mounted Raycap
and mounted wall Raycaps

11 Integrated sites for New AWS and PCS

 
Qualifications

Comtrained

Osha 10

CPR/First Aid

AT&T Ask Yourself
AT&T Supplier Awareness

PIM-Level 1 Certification Kaelus

DOT-CSA

RF Awareness
 
Employment

ATS (Atlantic Tower Services)
November 2014-December 2015
AWS/PCS Install
EF&I Tech
Install AWS equipment for Verzion Projects and Integration and Call Testing.

Masctec Network Solutions
June 2014-Sept 2014
AT&T maintenance/Troubleshooting
LTE and GSM
New builds and old builds

FEDITC
Sept 2013-April 2014
Sprint LTE Upgrade
Microwave Installs
Install antenna and 1900,800 rrus
Install hybrid cables
Help with installs of MMBS and Battery cabinets
Decom of old existing antennas and coax cable
Install microwave dishes and radios
Saah Telecom
Aug 2013-Sept2013
Sprint Upgrade
Install antennas and radios
Install hybird cable and wire inside radios and MMBS

Spectra Services
May2013-July2013
Comtrained Climber & Rescuer
AT&T LTE upgrade

GSI
Nov 2012-May 2013
Georgia,ATL
Comtrained climber& rescuer
Installing antennas and raycaps and RRUs
Installing power wires and fiber wires
Wiring and powering up raycap
Running coaxial jumpers
Installing and making coaxial jumpers and doing connectors

Faegan
Sept 2012-nov 2012
South Boston, VA
Electrician Helper
Installing conduit {All Sizes}
Installing Cable Tray

Fabricating Cable Tray fittings

Terminating Motors, Field Instruments, Panels, etc

Roberts Company
Jan.2012-Sept. 2012
Aurora, NC
Electrician helper
Installing conduit {All Sizes}
Installing Cable Tray
Fabricating Cable Tray fittings
Terminating Motors, Field Instruments, Panels, etc

Hard Hats
Oct. 2011-Jan. 2012
Whitakers, NC
Electrician Helper Installing Cable Tray
Fabricating cable tray
Fluor
Feb. 2010-August 2010
Richmond, Va
Electrician helper
Installing conduit {All Sizes} Installing Cable Tray
Fabricating Cable Tray fittings
Terminating Motors, Field Instruments, Panels, etc.

SHAW
Feb 2009-Jan 2010
Dickerson Project MD
Electrician helper
Installing conduit all sizes
Installing cable tray

Education

GED
Purnell Sweet
P.O. BOX 1210
11344 Deep Branch Rd.
Pembroke, NC 28372
xxx-xxx-xxxx
xxx-xxx-xxxx
References

Dustin Peterson ATS PMxxx-xxx-xxxx

Todd Mitchell Ericsson CMxxx-xxx-xxxx

Steven Johnston Electrician Foreman xxx-xxx-xxxx

Last Resume Update January 6, 2016
Address Rocky Mount
E-mail lock Locked
Phone Number lock Locked
Resume File Brent-Dial-resume.pdf 173.56 kB

Contact Candidate

Login or purchase this resume contact details.