waste water treatment plant for a city 25 years ahead), Graduation Project Include:
-Hydraulic sections. - Layout of fresh water pipes network. -Sanitary pump station.
-Fresh water tanks - Layout of sanitary pipes network. -Concrete tank dimensioning.
-Dewatering plan for Excavations - Waste water treatment plant layout.
Work Experience:
-Technical office/Planning Engineer at Al Falah Contracting Co., Riyadh, KSA (Oct. 2015)
Working on mega Roads & Highways projects: Cost Planning, Preparation of Tender documents, Preparation of claims and
Following up the claims with governmental agencies, Evaluation of Tenders and reporting, Valuation and planning following
up on construction work in progress, Cost Management and recording, Analyzing contract documents drawings, Coordination
between structural other trades, Coordination between technical office and construction site, preparing as built drawings,
preparing shop drawings of excavation works.
- Staff Geotechnical Engineer at Marino Engineering Associates (MEA), Urbana, Il, USA (May 2014- Jul 2015)
Assisting senior geotechnical engineers and geologists in data reduction which includes preparing data sheets for tests,
borehole logs, supervising boreholes drilling and soil sampling, executing infield soil test, plotting soil profiles and sections,
assisting in soil lab tests according to US standards (ex. Liquid Limit, Plastic limit, Water Content, permeability test, sieve
analysis, Point Load test for rocks, Slake Durability of Shales & weak rocks, visual identification of soil samples)
-Geotechnical/Civil Engineer at HAMZA ASSOCIATES (HA), Cairo, Egypt (Sep.2012-Feb. 2014)
Design Assistance of projects:
Suez Canal Container Terminal Co.:
Deepening of seabed for east of Port Said quay wall (Slop stability, Structural Analysis modeling)
North Giza electrical power plant:
Foundation Analysis, including settlement and bearing capacity calculations
NGL natural Gas planet west Port Said:
Foundation selection recommendation, Settlement analysis, bearing capacity calculations
On shore facility for British Petroleum Egypt-GPO &Bechtel Co.:
Preparing factual report for field investigation and lab tests. (Tests include: liquid limit, plastic limit,
consolidation test, unit weight, and sieve analysis)
Shbeen Elkom Mosque at Cairo, Egypt:
Preparing of factual report includes settlement analysis.
Zamil steel new shipyard in Dammam, Saudi Arabia:
Settlement analysis, bearing capacity calculation and PLAXIS simulation of R.C Rail track.
New Jetty at Aquba Port, Jordon:
Initial design and cost estimate for the Jetty, supported on vertical steel tube concrete filled piles.
Internships:
- Summer training at Hamza Associates in Cairo, Egypt. (Summer of 2009, 2011, and 2012)
- Summer training at Arab Contractors in (Nile Schools) Port Said, Egypt. (Summer 2010)
Skills:
Computer Software:
Sap2000, AutoCAD, ETABS, Surfer, CorelDRAW, Microsoft Office
Slope stability programs: Geo Slope – Slide – BG Slope.
Settlement Analysis program.
SAFE, Sigma plot, PLAXIS, Csi-column, surfer
Languages:
- English (fluent written and spoken language)
- Arabic (native language)
- Test of English for International Communication (TOEIC), score 780 of 990
Additional Courses:
- Preparation of an international arbitration adviser in construction contracts and projects
- Introduction in Total Quality Management (TQM)
- Using Excel for engineers
- The Preparatory Works for the Construction of Buildings
- Finishing Works For Buildings
| Last Resume Update | January 14, 2017 |
| Address | Urbana |
Locked | |
| Phone Number | Locked |
| Resume File | ISLAM-M-SALAMA-resume-updated-2016.pdf 138.53 kB |

Locked