Extensive use of ArcEditor, ArcCatalog, and ArcMap
Microsoft Word, Excel, and PowerPoint
ERDAS Imagine
Carrara modeling and animation software
eCognition
SketchUp Modeling software
Map Production
PostgreSQL
Use of GPS
Python Programming
GPS TrackMaker
Writing and documentation
Data acquisition and collection
Quick Terrain Modeler

EDUCATION:
Bachelor of Science in Environmental Spatial Analysis (GIS and Environmental Studies)
University of South Alabama
Certificate of Geographic Information Systems
Southern University A&M
Certificate of Environmental Studies
Midwestern State University

CERTIFICATION:
Ericsson RBS Builder 3
Ericsson LTE HS1
Ericsson T- Mobile Multi- Standard Solution
SBCA Certified Installer

JOB HISTORY:

Nexgen utility solutions
Foreman Verizon Jan 2016- present
Verizon new builds

Indoor installation of Fif cabinets with rru and duplexes
level and alignment
Measure, drill and mount cabinets to floor
Terminate and crimp lugs to grounds
Secure multiple runs of Cat5e with lacing cord to cable racks
Run and install fiber optic cables from fiber duct
Starter stitch, H

Davey Resource Group May 2016 - December 2016

Working to engineer a safe but effective pole for the Google Fiber to attach to
Engineering utility poles, making sure poles can support the Google Fiber
Making 2-D and 3-D layouts and models
QM3 Utility Services January 2015-January 2016
GIS Technician/ Data Collector

Data Collection
Labeling and editing GEOTAGS
Collecting agricultural points and lines
Using Trimble GPS units

Mastec network solutions July 2013 to January 2015
Foreman- AT&T

LTE Installation of DUL, SAU, GPS connections, GPS antenna
SAU alarm cables and terminations to 66 blocks
LTE commissioning, integrations and call testing
LTE trouble shooting EMAS Alarms / NEA validation
UMTS/OBIF 1st - 5th Carrier installation. COPs/MOPs
IPBH Troubleshooting
1900/850 configures

Bluestream/kgp July 2013 to January 2016

Field Technician III – AT&T

LTE Installation of DUL, SAU, GPS connections, GPS antenna

SAU alarm cables and terminations to 66 blocks

LTE commissioning, integrations and call testing

LTE trouble shooting EMAS Alarms / NEA validation

UMTS/OBIF 1st - 5th Carrier installation. COPs/MOPs

IPBH Troubleshooting

1900/850 configures

AFL Global September 2012- November 2012
T-Mobile Modernization New Jersey

Installation / Configuration and Integration 2G converted/upgraded to 3G & RBS 6000 series
2C (Air), 3A, 3B (RRUs), 4A & 4B (RBS 6000) cabinet configuration.
Upgrade Power Sub rack w/BFU, PDU, PSU.
Mount GPS, replace SPDs
Add SCU, SHU, SAU
Install DUG (GSM), Load software, DUW (UMTS) & DUL (LTE)
Terminate Hybrid Cable

James Services Corp. June 2012- September 2012
AT&T Upgrades Dallas TX

AT&T UMTS 3rd, 4th and 5 carrier installation
(GR3, FAB3, FAHS1)
Install DWU and 66 blocks, power up RRU’s
Run Cat5, oil and fiber cables.

Ian Martin Engineering & I. T. Staffing (ERICSSON)(FSO)
LTE Installer/ Quality Team Philadelphia PA (Metro PCS) April 2012- June 2012

6201 delta cabinets
Install anchors, level, align and secure equipment
Terminate and crimp lugs to earth grounds
Measure, cut conduits for transmission and power cables
Install jumper cables for alpha, beta, gamma
T1 /T2
Trouble shoot dip switch
Commission the SIU, load correct tar file and Scripts
OJT On site integration DUL/SIU

LTE Installer/ Quality Team New York (Metro PCS EVDO) September 2011- February 2012

LTE RBS 6201 3sector and 6 sector upgrades
Run Fiber Optics and LMR Cables from Mini RE Cabinet to 6201
Terminate grounds and earth groundings to cabinet
Install SIU and DUL Place Ethernets
Install RRU
Instal1 GPS and RF Jumpers
Following updated MOPS
Labeled all added site equipment

Builder 3 Hammond, Louisiana (Sprint Nortel switch) February 2011- May 2011

Indoor installation of CDMA cabinets level and alignment
Measure, drill and mount cabinets to floor
Terminate and crimp lugs to grounds
Secure multiple runs of Cat5e with lacing cord to cable racks
Run and install fiber optic cables from fiber duct
Starter stitch, H stitch and Kansas City stitch

Builder 3 El Paso, Texas (Verizon Motorola switch) June 2011- July 2011

Install ladder racks
Run Cat5e
Work as a team to run large number of fiber optics
Terminated cables at master ground bar -48v, +48v, - 24v, +24v
Add to or replace fuse on circuit breaker
Starter stitch, H stitch and Kansas City stitch

Last Resume Update November 18, 2017
Address Durham
E-mail lock Locked
Phone Number lock Locked
Resume File Jayvon-Holt-new-res_1.docx 15.48 kB

Contact Candidate

Login or purchase this resume contact details.