Instrumentation Technician for Offshore GOM Production
Electrical and Instrumentation Construction Consultant
Electrical and Instrumentation Construction and Commissioning Superintendent
Field Experience 3 years offshore, 12 years on land Oil and Gas production facilities
Licensed Master Electrician Texas TDLR#295316 as of 2013
Licensed Journeyman Electrician Texas TDLR128349 as of 2006
Licensed Journeyman Electrician Wyoming J-26122 as of 2010
Licensed Journeyman Electrician Colorado 600177 as of 2013
Have current TWIC, HUET, T2, CPR/FIRST AID
Current Employer: Shell Exploration and Production Company June 2015 to present
Previous Employer: Custom Automated Controls Inc. New Iberia La. Feb 2000 to June 2015
Previous Employer: Restaurants And Cafes Inc. Baton Rouge Laxxx-xxx-xxxx
Education:
Graduate ; 1988 Robert E Lee High School
Certified Draftsman; LSU Continuing Education
Continuing education of NEC / State Law to maintain Master and Journeyman Electrical
Licenses from 2007 to present
Certifications & Training:
Advanced Instrumentation Asbestos
Basic Instrumentation Basic Production Safety Systems (T2)
Benzene Confined Space Entry
Controls/SSDS Corrosion
DCS/Control Room Operator DOT Hazmat
Electrical Safety Electronic Instrumentation
Emergency Action Plans Emissions and Discharges
Environmental Compliance Fall Protection
Fatigue Management Advanced Marine Fire Fighting
Gas Venting and Flaring Gas Testing
Hazcom/Hazwoper Hearing Protection
Helideck Assistant HAD Hydrogen Sulfide
Lifeboat Passenger Lockout/Tagout
Transducers Fire and Gas Systems
Hose Management Instrumented Protection Systems
Measuring Devices/Analyzers Process Controllers
Process Control Systems Control Valves
ESD Valves Fire and Gas Detection Devices
Management of Change MOC Manual Handling
Marine Trash and Debris Medical Emergency Response
Medic First Aid Near Miss & Incident Reporting
Nitrogen Safety NPDES
Rigging PLC Maintenance and Troubleshooting
Portable Fire Extinguishers Process Safety Management
Radio and Communication Systems Respiratory Protection
SEMS Safe Systems of Work JHA &PTW
Safety Bypass Standards SAP
Toxic Substances Valve Maintenance
Waste Management Water Survival HUET
Witness Gas/Crude/Condensate Metering Worksite Hazard Managemet
Experience:
--Shell Olympus TLP GOM 2015 to present
_Instrument Technician
Instrumentation maintenance, Regulatory Testing
--OneOk Compressor Station Upgradexxx-xxx-xxxx
_I & E Superintendent
Work planning and layout, scheduling, cost tracking, material procurement
--Williams Ignacio Gas Plant Expansion Phasexxx-xxx-xxxx
_I & E Superintendent
Work planning and layout, scheduling, cost tracking, material procurement
--Williams Ignacio Gas Plant Expansion Phasexxx-xxx-xxxx
_I & E Superintendent
Work planning and layout, scheduling, cost tracking, material procurement.
--Southern Union Gas Halley Gas Plant Phase Two and Winkler County Booster Station Expansion 2012
_I&E Superintendent
Work planning and layout, work with crew pulling wire, installing conduit and cable tray, installing instrumentation and tubing, terminations, loop checks and troubleshooting.
--ExxonMobil Hawkins Gas Plant NRU Project Hawkins, Txxxx-xxx-xxxx
-Consultant to ExxonMobil on NRU Project
Supervising and coordinating I & E Contractors on construction activities
Inspection of electrical and instrumentation systems
--ExxonMobil Shute Creek Facility Kemmerer, Wyxxx-xxx-xxxx
-Consultant to Exxonmobil on CO2 Sales Expansion Project
Supervising I & E contractor on construction activities
Commissioning I &E equipment
--ExxonMobil Piceance Creek Rifle Co. 2009
-Commissioning Tech
Assisted engineering with commissioning of well sites and treating facilities
--ExxonMobil Means Field Andrews, Tx. 2008
-Superintendent on Caps Replacement Project
Installed new PLC equipment
Function checks of equipment at 26 meter sites
Procured materials, cost tracking, quality control, safety policy enforcement,
Crew scheduling
--ExxonMobil Means Field Andrews, Tx. 2008
-Superintendent on South End Water Pump Project
Installed ground grid, cable tray system, cables, lighting and receptacles
Made terminations to overhead line,1000kva transformer primary and secondary terminations 12.5kv/4160v
Oversaw and assisted with terminations to 480v equipment, lighting and power, and instrumentation
Installed and tested instrumentation for facility
Commissioned instrumentation and electrical equipment
Procured materials, cost tracking, quality control, safety policy enforcement, crew scheduling
--ExxonMobil Piceance Creek Rifle Co. 2007
-Superintendent on Kold Catcher Heating Equipment Installation
Installed heat trace tubing along with crew
Installed Kold Catcher units at 10 natural gas well locations
Commissioned tubing and heater units
Procured materials, cost tracking, quality control, safety policy enforcement, crew scheduling
--ExxonMobil Hawkins Gas Plant Hawkins, Tx. 2007
-Superintendent on Caps Replacement Project
Upgraded electrical service to meter sites for gas plant
Coordinate shut-ins with field operations and power provider
Installed PLC buildings, cable tray, cable, instrumentation, I/O panels
Commissioned new equipment
Oversaw installation of new PLC equipment
Assisted in function checks of equipment and troubleshooting
Installed tubing and solenoids on valve headers
Assisted engineering with electrical and instrumentation layout and Wonderware programming
--Marlin Midstream Woodville Gas Plant Woodville Tx. 2006
-Superintendent on Plant 2 Construction
Assisted engineering with electrical and instrumentation layout
Installed new MCC building in Plant 1
Installed fiber optic communications network
Installed motor starters, medium and low voltage motors
Installed PLC and analyzer equipment
Installed cable tray system, conduit and duck bank system, cables, lighting and power, instrumentation, fire and gas system
Commissioned all electrical and instrumentation equipment
Assisted with plant start-up
--Additional projects as I & E superintendent:
Marlin Midstream Carthage Cryogenic Gas Plant
Marlin Midstream Woodville Gas Plant 1
Marlin Midstream Amine Plant Expansion
ExxonMobil Katy Gas Plant Booster Station
Superior Optimization Salt Water Injection Facility
References:
Pete Gibson ExxonMobilxxx-xxx-xxxx
Barry Simon ExxonMobilxxx-xxx-xxxx
Gaylon Knight Marlin Midstreamxxx-xxx-xxxx
Floyd Woodfork Marlin Midstreamxxx-xxx-xxxx
Larry French Holloman Engineeringxxx-xxx-xxxx
Alan Vickrey ExxonMobilxxx-xxx-xxxx
Ben Finley Anadarkoxxx-xxx-xxxx
Kyle Hux Shellxxx-xxx-xxxx
Brian Eleser Shellxxx-xxx-xxxx
David Bergeron Shellxxx-xxx-xxxx
| Last Resume Update | August 24, 2016 |
| Address | Los Angeles |
Locked | |
| Phone Number | Locked |
| Resume File | Philip-Scott-Finley-7.25.2016.docx 20.84 kB |

Locked