OBJECTIVE
To seek a professional position in a dynamic/reputed organization in the field of Implementation of Telecom to work in a challenging and hardworking environment in order to achieve excellence and to prove my abilities and talents and share my part towards accomplishment of employers objectives in terms of reputation and profit for overall organization.
EDUCATION
METRICAULATION FROM BOARD OF INTERMEDIATE & SECONDARY SARGODHA (2006)
F.A FROM BOARD OF INTERMEDIATE & SECONDARY SARGODHA (2008)
EXPERIENCE
Seder Group APD KSA 26thJune 2015-To- Till Date
Work as a Telecom Technician / Regar for Mobily Huawei MS Project in South Region KSA.
Troubleshooting, Rectification of All MW Huawei RTN (910,950,980), RTN 310 , NEC Pasolink and Huawei DBS/BTS (3900 , 3812 & 3012) Operation Related issues for LTE, 4G , 3G & 2G Sites.
Responsible to Clear All Alarms on the network like RTWP, RSSI, ALD, RF unit , RX channel Fault, CPRI interface Error, Device maintenance Link failure, Radio Interface.
Troubleshoot the VSWR, RTWP issues of 3G Sites.
Have done PMR of Sites.
PAT and Pre – PAT Activity for New Hand over of STC Sites.
Configuration and Troubleshooting of External Alarms for Sites.
Performed MDT’s such as MW Link Alignment, TRX Expansions, and BTS Swap.
Clearance of Critical Outages and Degraded Trouble Tickets in a Minimum Time.
KHATEM TELECOMMUNICATION SERVICES LLC DUBAI UAE (JUNE 2013 - PRESENT) FOR ETISALAT PROJECTS
DONE THE COMPLETE INLLATION OF 3G AMD LTE RRUs
MAJOR SITES DUBAI MALL AND MIRDIFF CITY CENTER
DONE THE INSTALLATION OF OMB FOR 3G AND LTE AS PER ETC STANDARD
DONE THE INSTALLATION OF BBU FOR 3G AND LTE
DONE THE TROUBLESHOOTING OF VSWR ISSUES,COMPLETE SITE TESTING WITH SITE MASTER
DONE THE POWER CONNECTION FOR DCDB AND ACDB AS PER ETISLAT STANDARD
DONE THE INSTALLATION OF HUAWEI BTS 3900 FOR LTE AND OUTDOOR SITES
FOR DU PROJECTS (LTE,TI,IBS)
RESPONSIBLE FOR INDOOR AND OUTDOOR INSTALLATION OF BTS SITES
COMPLETE INSTALLATION OF 2G , 3G & LTE SYSTEM
COMPLETE IBS SITE INSTALLATION
INSTALLATION OF HUAWEI BTS 3900
MW ANTENNAS INATALLATION 0.3,0.6,0.9,1.2,1.8
INATALLATION OF 3G , 2G & LTE IN OUTDOOR SITES
INSTALLATION OF 2G ,3G & LTE IN IBS SITES
COMPLETE INSTALLATION OF OUTDOOR LAYOUT OF FEEDER CABLE , TRIPLAXERS,TMA , ANTENNAS ETC
INSTALLATION OF DAS ACCORDING TO DESIGN
INSTALLATION OF DC SYSTEM POWER ONE , DELTA METC
MAKE CONNECTORES OF SUPER FLEX .LDF ,7/8 15/8 ETC
UPGRADING OF MW LINKS ODU
OPTICAL FIBER LAYING ACCORDING TO THE ENVIORMENT ON SITE
INSTALLTION OF DDF WITH E1 PACTHING
MW ALIGNMENT
SITE MANAGEMENT
DU IBS CIVIL WORK
DONE THE INSTALLATION OF CW AS PER DU STANDARD
DONE THE INSTALLATION OF ACDB, POWER METER, ISOLATOR AND BUS BAR
DONE THE INSTALLATION OF TRUNKEY IN GSM ROOM
MW POLE INSTALLAION
PREPARE THE DAS TAPPING
WAJDA INTERNATIONAL TELECOM SERVICES UAE (JUNE 2011 TO JUNE 2013) FOR DU PROJECTS
RESPONSIBLE FOR INDOOR AND OUTDOOR INSTALLATION OF BTS SITES
COMPLETE INSTALLATION OF 2G , 3G & LTE SYSTEM
COMPLETE IBS SITE INSTALLATION
INSTALLATION OF HUAWEI BTS 3900
MW ANTENNAS INATALLATION 0.3,0.6,0.9,1.2,1.8
INATALLATION OF 3G , 2G & LTE IN OUTDOOR SITES
INSTALLATION OF 2G ,3G & LTE IN IBS SITES
COMPLETE INSTALLATION OF OUTDOOR LAYOUT OF FEEDER CABLE , TRIPLAXERS,TMA , ANTENNAS ETC
INSTALLATION OF DAS ACCORDING TO DESIGN
INSTALLATION OF DC SYSTEM POWER ONE , DELTA METC
MAKE CONNECTORES OF SUPER FLEX .LDF ,7/8 15/8 ETC
UPGRADING OF MW LINKS ODU
OPTICAL FIBER LAYING ACCORDING TO THE ENVIORMENT ON SITE
INSTALLTION OF DDF WITH E1 PACTHING
MW ALIGNMENT
SITE MANAGEMENT
ETISALAT PROJECTS DUBAI REGION
DONE INSTALLATION OF HUAWEI BTS3900 LTE INDOOR/IBS
COMPLETE CABLE LAYING FOR TRANSMISSION AND OPTICAL FIBER FOR BTS TO ODF
DONE THE INSTALLATION OF POWER DB AND RACTIFIER AS PER ETISALAT STANDARD
DONE COPLETE IBS(DAS+TI) ETISATAL IN DUBAI REGION
HAND ON EXPERIENCE OF MAKE CONNECTOR ALL TYPES.
GOOD UNDERSTANDING OF LAYOUT SCHEMATIC AND ANTENNA
INTERNATIONAL SYSTEM ENGINEERING & SERVICES (INTER SES) (JUNE 2009 TO JULY 2010)
INSTALLATION OF BTS FOR HUAWEI , ZTE , ALCATEL
INSTALLATION OF BTS FOR HUAWEI ON UFONE PROJECT ALL OVER PAKISTAN
INSTALLATION OF COMPLETE OUTDOOR SYSTEM INCULADIND LAYOUT OF FEEDERS , ANTENNAS OF DUAL BANDS 900, 1800 ,TRIPLEXERS ETC
INSTALLATION OF MW 03,0.6,1.2,1.8 OF HUAWEI FOR UFONE PROJECT
INSTALLATION OF MW 03,0.6,1.2,1.8 OF ALCATEL FOR ZONG PROJECT
DONE THE EXPANSTION OF SECTOR ACCORDING TO THE COSTUMER
MAKE CONNECTORS OF IF CABLE
MAKE CONNECTORS OF FEEDER CABLES 7/8,15/8 ETC
INSTALLATION OF POWER SYSTEM DC & AC
UPGRADE MW LINKS FROM 1+0 TO 1+1
TROUBLESHOOTING OF VSWR
GOOD KNOWLEDGE OF USING COMPASS
SITE MANAGEMENT
MOBISERVE PAKISTAN (MOBILINK OPERATION) (AUG 2010 TO JUNE 2011)
DONE THE PM OF SITES IN MURDAN
DONE THE CM OF SITES IN MURDAN
CLEAR VSWR OF LIVE SITES
CLEAR POWER ISSUES ON LIVE SITES
TROUBLESHOOTING OF MW LINKS
REPLACMENTS OF FALUTY ODU & IDU
CLEAR EXTERNAL ALARM OF LIVE SITES
REPLACEMENT OF FALUTY TRX CARD
FINE TUNE OF LIVE MW
PERSONAL INFORMATION
Nationality : Pakistani
Date of Birth : 01 September 1989
Father Name : Muhammad Amir
Marriage Status : Married
Passport Exp : 30 june 2019
Visa Status : Employment(till 27 Sep 2015)
REFERENCE
WILL BE AVAILABLE ON DEMAND
| Last Resume Update | August 23, 2016 |
| Address | Jeddah |
Locked | |
| Resume File | Sajid-Hameed-Telecom-Sr-Technician-.docx 32.74 kB |

Locked