OBJECTIVE

To seek a professional position in a dynamic/reputed organization in the field of Implementation of Telecom to work in a challenging and hardworking environment in order to achieve excellence and to prove my abilities and talents and share my part towards accomplishment of employers objectives in terms of reputation and profit for overall organization.

EDUCATION

METRICAULATION FROM BOARD OF INTERMEDIATE & SECONDARY SARGODHA (2006)

F.A FROM BOARD OF INTERMEDIATE & SECONDARY SARGODHA (2008)

EXPERIENCE

Seder Group APD KSA 26thJune 2015-To- Till Date

Work as a Telecom Technician / Regar for Mobily Huawei MS Project in South Region KSA.

Troubleshooting, Rectification of All MW Huawei RTN (910,950,980), RTN 310 , NEC Pasolink and Huawei DBS/BTS (3900 , 3812 & 3012) Operation Related issues for LTE, 4G , 3G & 2G Sites.
Responsible to Clear All Alarms on the network like RTWP, RSSI, ALD, RF unit , RX channel Fault, CPRI interface Error, Device maintenance Link failure, Radio Interface.
Troubleshoot the VSWR, RTWP issues of 3G Sites.
Have done PMR of Sites.
PAT and Pre – PAT Activity for New Hand over of STC Sites.
Configuration and Troubleshooting of External Alarms for Sites.
Performed MDT’s such as MW Link Alignment, TRX Expansions, and BTS Swap.
Clearance of Critical Outages and Degraded Trouble Tickets in a Minimum Time.

KHATEM TELECOMMUNICATION SERVICES LLC DUBAI UAE (JUNE 2013 - PRESENT) FOR ETISALAT PROJECTS

DONE THE COMPLETE INLLATION OF 3G AMD LTE RRUs

MAJOR SITES DUBAI MALL AND MIRDIFF CITY CENTER

DONE THE INSTALLATION OF OMB FOR 3G AND LTE AS PER ETC STANDARD

DONE THE INSTALLATION OF BBU FOR 3G AND LTE

DONE THE TROUBLESHOOTING OF VSWR ISSUES,COMPLETE SITE TESTING WITH SITE MASTER

DONE THE POWER CONNECTION FOR DCDB AND ACDB AS PER ETISLAT STANDARD

DONE THE INSTALLATION OF HUAWEI BTS 3900 FOR LTE AND OUTDOOR SITES

FOR DU PROJECTS (LTE,TI,IBS)

RESPONSIBLE FOR INDOOR AND OUTDOOR INSTALLATION OF BTS SITES

COMPLETE INSTALLATION OF 2G , 3G & LTE SYSTEM

COMPLETE IBS SITE INSTALLATION

INSTALLATION OF HUAWEI BTS 3900

MW ANTENNAS INATALLATION 0.3,0.6,0.9,1.2,1.8

INATALLATION OF 3G , 2G & LTE IN OUTDOOR SITES

INSTALLATION OF 2G ,3G & LTE IN IBS SITES

COMPLETE INSTALLATION OF OUTDOOR LAYOUT OF FEEDER CABLE , TRIPLAXERS,TMA , ANTENNAS ETC

INSTALLATION OF DAS ACCORDING TO DESIGN

INSTALLATION OF DC SYSTEM POWER ONE , DELTA METC

MAKE CONNECTORES OF SUPER FLEX .LDF ,7/8 15/8 ETC

UPGRADING OF MW LINKS ODU

OPTICAL FIBER LAYING ACCORDING TO THE ENVIORMENT ON SITE

INSTALLTION OF DDF WITH E1 PACTHING

MW ALIGNMENT

SITE MANAGEMENT

DU IBS CIVIL WORK

DONE THE INSTALLATION OF CW AS PER DU STANDARD

DONE THE INSTALLATION OF ACDB, POWER METER, ISOLATOR AND BUS BAR

DONE THE INSTALLATION OF TRUNKEY IN GSM ROOM

MW POLE INSTALLAION

PREPARE THE DAS TAPPING

WAJDA INTERNATIONAL TELECOM SERVICES UAE (JUNE 2011 TO JUNE 2013) FOR DU PROJECTS

RESPONSIBLE FOR INDOOR AND OUTDOOR INSTALLATION OF BTS SITES

COMPLETE INSTALLATION OF 2G , 3G & LTE SYSTEM

COMPLETE IBS SITE INSTALLATION

INSTALLATION OF HUAWEI BTS 3900

MW ANTENNAS INATALLATION 0.3,0.6,0.9,1.2,1.8

INATALLATION OF 3G , 2G & LTE IN OUTDOOR SITES

INSTALLATION OF 2G ,3G & LTE IN IBS SITES

COMPLETE INSTALLATION OF OUTDOOR LAYOUT OF FEEDER CABLE , TRIPLAXERS,TMA , ANTENNAS ETC

INSTALLATION OF DAS ACCORDING TO DESIGN

INSTALLATION OF DC SYSTEM POWER ONE , DELTA METC

MAKE CONNECTORES OF SUPER FLEX .LDF ,7/8 15/8 ETC

UPGRADING OF MW LINKS ODU

OPTICAL FIBER LAYING ACCORDING TO THE ENVIORMENT ON SITE

INSTALLTION OF DDF WITH E1 PACTHING

MW ALIGNMENT

SITE MANAGEMENT

ETISALAT PROJECTS DUBAI REGION

DONE INSTALLATION OF HUAWEI BTS3900 LTE INDOOR/IBS

COMPLETE CABLE LAYING FOR TRANSMISSION AND OPTICAL FIBER FOR BTS TO ODF

DONE THE INSTALLATION OF POWER DB AND RACTIFIER AS PER ETISALAT STANDARD

DONE COPLETE IBS(DAS+TI) ETISATAL IN DUBAI REGION

HAND ON EXPERIENCE OF MAKE CONNECTOR ALL TYPES.

GOOD UNDERSTANDING OF LAYOUT SCHEMATIC AND ANTENNA

INTERNATIONAL SYSTEM ENGINEERING & SERVICES (INTER SES) (JUNE 2009 TO JULY 2010)

INSTALLATION OF BTS FOR HUAWEI , ZTE , ALCATEL

INSTALLATION OF BTS FOR HUAWEI ON UFONE PROJECT ALL OVER PAKISTAN

INSTALLATION OF COMPLETE OUTDOOR SYSTEM INCULADIND LAYOUT OF FEEDERS , ANTENNAS OF DUAL BANDS 900, 1800 ,TRIPLEXERS ETC

INSTALLATION OF MW 03,0.6,1.2,1.8 OF HUAWEI FOR UFONE PROJECT

INSTALLATION OF MW 03,0.6,1.2,1.8 OF ALCATEL FOR ZONG PROJECT

DONE THE EXPANSTION OF SECTOR ACCORDING TO THE COSTUMER

MAKE CONNECTORS OF IF CABLE

MAKE CONNECTORS OF FEEDER CABLES 7/8,15/8 ETC

INSTALLATION OF POWER SYSTEM DC & AC

UPGRADE MW LINKS FROM 1+0 TO 1+1

TROUBLESHOOTING OF VSWR

GOOD KNOWLEDGE OF USING COMPASS

SITE MANAGEMENT

MOBISERVE PAKISTAN (MOBILINK OPERATION) (AUG 2010 TO JUNE 2011)

DONE THE PM OF SITES IN MURDAN

DONE THE CM OF SITES IN MURDAN

CLEAR VSWR OF LIVE SITES

CLEAR POWER ISSUES ON LIVE SITES

TROUBLESHOOTING OF MW LINKS

REPLACMENTS OF FALUTY ODU & IDU

CLEAR EXTERNAL ALARM OF LIVE SITES

REPLACEMENT OF FALUTY TRX CARD

FINE TUNE OF LIVE MW

PERSONAL INFORMATION

Nationality : Pakistani

Date of Birth : 01 September 1989

Father Name : Muhammad Amir

Marriage Status : Married

Passport Exp : 30 june 2019

Visa Status : Employment(till 27 Sep 2015)

REFERENCE

WILL BE AVAILABLE ON DEMAND

Last Resume Update August 23, 2016
Address Jeddah
E-mail lock Locked
Resume File Sajid-Hameed-Telecom-Sr-Technician-.docx 32.74 kB

Contact Candidate

Login or purchase this resume contact details.