ERICSSON “UMTS” Commissioning certified, April 2013.
Complete all “ATT” job related training and certified.

Relative Experience:

AVION Systems INC: Mississippi Market Dec 2015-Current
LTE : Installation & Upgrade _ C Spire

LTE_ Install Task Summary: Install the battery backup connection. Install the GPS on the pole and connect to the Cabinet. Install the Ray Cap cabinet to the pole and run Conduit from the LTE Cabinet to the Ray Cap Cabinet. Run the Power Cable and Fibers through the Conduit. Create the Power connectivity from LTE Cabinet to the Ray Cap. Scope Test the Fibers for the Light source and Clarity. Perform the volte Polarity test.
LTE_ Upgrade Task Summary: Install the battery backup connection. Install the GPS on the pole and connect to the Cabinet. Install the Ray Cap cabinet to the pole and run Conduit from the LTE Cabinet to the Ray Cap Cabinet. Run the Power Cable and Fibers through the Conduit. Create the Power connectivity from LTE Cabinet to the Ray Cap. Scope Test the Fibers for the Light source and Clarity. Perform the volte Polarity test.
Remove the existing BBU from the CDMA Cabinet and place it to LTE Cabinet. Upgrade the RUC. Transfer the existing Script from the Old RUC to the Upgraded RUC.

Mastec: DFW Market- “Satellite Dish Installer” Jun, 2015- Nov, 2015
Survey the best location to install the dish. Verify the work order with customer. Mount the Dish. Run Coax cable. Setup the Device and perform the various tests for the best signal and regulations. Educate the client about the device and performance.

Amatel: North & South Texas Market_ “RT 2” Apr, 2014- May, 2015
1C LTE Add Carrier_ ATT: “Troubleshoot, Installation, Integration, Call test, NEA test”
3C LTE Add Carrier_ ATT: “Troubleshoot, Installation, Integration, Call test, NEA test”
GSMoE Migration_ T Moblie: “Decommissioned LTE cabinet and move SIU to WCDMA”
UMTS Migration_ ATT: “Replace CBU and add duel DUW on 3106 & 3206”
LTE_ Task Summary: Installed/Replace v1/v2 Chassis. Add DUS enode B for 1st 2nd & 3rd Carrier. Run/Upgrade the power cable. Run transport from SIAD to enode B. Installed SAU and punched down the alarm at 66Block. Verify DC and RAY CAP alarm from DC Converter & RAY CAP to 66 Block. Installed GPS and Upgrade GPS Receiver. Perform Manuel and SL Integration (Tool Used: “Hyper terminal” to create connectivity between PC and enodeB, “Command Prom” for Ping Test, Use “WS/Total Commander/Cesar FTP” for file transfer, Used “eMas” for upgrade and Script) . Perform Sectorization and Swap Sector on 3C LTE. Perform ACT and VOLTE Call test on all Sector as market required. Perform External/Eternal NEA Test through verify the Script on 1C LTE. Make sure VSWR & RSSI Values met as required. Verify no alarm through NIC.
GSMoE_ Task Summary: Create room for SIU at WCDMA Cabinet. Relocate the SIU from LTE cabinet to WCDMA. Dismantle the LTE equipment and cabinet. Disconnect the power from the power bay and the battery. Re run the transport from Siena Box to SIU and SIU to CBU. Punch down the alarm cable.
Run the power cable and powered up SIU. Configure SIU with Putty and transfer backup script through MS Ftp. Verify no alarm through NOC.
UMTS_ Task Summary: Remove Auxiliary unit from 3106/3206 and replace with duel DUWs. Migrate the transport to Ethernet Port from ATM Port. Power the devices. Connect antenna fibers by replacing the Emily cables. Perform Manuel and SL Integration (Tool Used: “Hyper terminal” to create connectivity between PC and enodeB, “Command Prom” for Ping Test, Use “WS/Total Commander/Cesar FTP” for file transfer, Used “eMas” for upgrade and Script). Trouble shoot : RRUW, RRUS, FU,RU through DUMMY LOAD. Troubleshoot: VSWR and RSSI by checking the connection of jumper, Frequency or Band mismatch. Troubleshoot: Transport from RBS to NIU card. Perform Call test by using TEMPS phone. Also perform external/eternal NEA test

AVION Systems INC: Ohio/Michigan Market_ “RT 2” Nov 2013-Jan 2014
LTE 1C: Troubleshooting, Integration, Installation, bCEM upgrade _ ATT

LTE_ Task Summary: Working on Alcatel-Lucent LTE “BBU” eNodeB software updates, Commissioning and Integration. Performed Power up and testing of an eNodeB. Performed commissioning using a CIS/Work Order and the eCT. Performed quality Audit on site and corrected required steps as per customer’s requirement. Install site as per customer’s satisfaction including termination of all User Alarm cables, CPRI cables and Transport cable.
Terminated external Alarm cables on 66 Block and configured in ALU software. Capable of understanding all functions of NEM, eCT and IceT tools. Worked with Core Controller Module which supports backhaul interface/Call Processing/Data Switching & routing/OA&M/Frequency and Timing. Complete Basic Provisioning for 7705 SAR-8. Complete eCEM to bCEM upgrade and integration with RITC. Perform RUC CN for new V5 RUC with RITC.

PRITHVI Info Solution: Pittsburgh, Ohio, West Virginia Market_ “RT 2” Jun 2013-Aug 2013
UMTS Add Carrier: Troubleshoot, Integration, Installation_ ATT

UMTS_ Task Summary: Add Sector and Integrate for 3106, 3206, 6601 Cabinet. Perform 2C, 3C, 4C and DUW Integration and Installation. For DUW Integration: Run commands for NODE B through hyper terminal. Transfer c2 and d by using Total Commander. Start download upgrade package through Element Manager. Start RBS integration through upload script from “Site Script”. After complete commissioning call NIC to complete Integration. Through E//: Tools, Run command file run “Mo file”. Tools, Modify RBS Cabinet run “Add Sector.XML file”. Call NIC to run the Base line and perform the Call test. Perform NEA “External” test for UMTS. Troubleshoot minor and major alarms on UMTS.
Troubleshoot T1 issue. Troubleshoot Telco and NIU card. Troubleshoot on RSSI and VSWR Issue.
Troubleshoot on Power Issue. Create detailed COP with Dar, EMAS screenshots, NODE B forms.
Installation: Install DUW, RRUW, SAU, and Run Alarm Cable from SAU to 66 blocks. Punch down the Alarm cable. Make Coax, Power cable. Run the FIBER, T1 Cable from DUW to Surge. Label all the Cable and Device.

AFL Network: North, South & Arkansas Texas Market_ “RT 2” Jan 2013 to May 2013
GSM oE Migration: Migrate transport, Troubleshoot, Site Survey_ ATT

GSMoE_ Task Summary: Verify the existing port on DSX, PSAX, LMU, RBS 2206/2201, NIU and the SURGE. Verify the existing cable for DSX, PSAX, LMU, RBS, NIU and the SURGE. Create the new connection by replacing old Cat 5 to Cat 6 cable. Run the cable through the ladder rack. Perform the continuity test on CISCO Router (SIAD). Make DB 15 pin adopter for new Ethernet connection. Make new RJ45 head for straight and cross over Cat6 cable. Perform e911 call test prior and after complete the successful migration.

AFL Network: Chicago and Surrounding Aria _”RT2” Sep 2012 to Nov 2012
LTE Multi Carrier Add: Integration, Commissioning, Installation_ Verizon

LTE Task Summary: Run/Upgrade the power cable. Run transport from “Alcatel lucent 7500 router” to enode B. Installed SAU and punched down the alarm at 66Block. Verify DC and RAY CAP alarm from DC Converter & RAY CAP to 66 Block. Installed GPS and Upgrade GPS Receiver. Perform Manuel and SL Integration (Tool Used: “Hyper terminal” to create connectivity between PC and enodeB, “Command Prom” for Ping Test, Use “WS/Total Commander/Cesar FTP” for file transfer, Used “eMas” for upgrade and Script) . Perform Sectoraization and Swap Sector on 3C LTE. Perform ACT and VOLTE Call test on all Sector as market required. Perform External/Eternal NEA Test through verify the Script on 1C LTE. Make sure VSWR & RSSI Values met as required. Verify no alarm through NIC. Perform Data test.
Perform troubleshoot on “Alcatel lucent 7500 router” with switch group. Troubleshoot minor and major alarms on DUS

SPECTRUM Wireless: Louisiana and Surrounding_ “RT 1” May 2012 to July 2012
UMTS Add Carrier: Integration, Installation, troubleshot_ ATT

UMTS_ Task Summary: Add Sector and Integrate for 3106, 3206, 6601 Cabinet. Perform 2C, 3C, 4C and DUW Integration and Installation. For DUW Integration: Run commands for NODE B through hyper terminal. Transfer c2 and d by using Total Commander. Start download upgrade package through Element Manager. Start RBS integration through upload script from “Site Script”. After complete commissioning call NIC to complete Integration. Through E//: Tools, Run command file run “Mo file”. Tools, Modify RBS Cabinet run “Add Sector.XML file”. Call NIC to run the Base line and perform the Call test. Perform NEA “External” test for UMTS. Troubleshoot minor and major alarms on UMTS.
Troubleshoot T1 issue. Troubleshoot Telco and NIU card. Troubleshoot on RSSI and VSWR Issue.
Troubleshoot on Power Issue. Create detailed COP with Dar, EMAS screenshots, NODE B forms.
Installation: Install DUL/DUW, RRUW, SAU, GPS, Poly Phyfe. Power DUL/DUW, RRUW, and Run Alarm Cable from SAU to 66 blocks. Punch down the Alarm cable. Make Coax, Power cable. Run the FIBER, T1 Cable from DUL/DUW to SIAD. Label all the Cable and Device. Create detailed COP with Dar, Pics, EMAS screenshots, NODE B and E-911 forms.

Scarlet wireless Communication: New York and Surrounding_ “RT 0”
UMTS Add Carrier: Integration, Installation_ ATT

UMTS_ Task Summary: Worked with SP crew to troubleshoot BTS sites. Install power upgrades of Ericsson RBS 3000 & 6000 series cabinets. Run fiber cables in and out of cabinet. Jumpers swing on 3206 from 2c 850 to 5c RRU 850. Perform parameter configuration on TMO 2C, 3A, 3B, 4A, 4B configuration. Use Hyper Terminal in the integration of WCDMA cabinets. Troubleshoot alarms on Ericsson UMTS, using Ericsson hardware and software configuration. Work on RBS 3000 & 6000 series troubleshooting; hardware failures, RF transmitting failure. Validate end to end connectivity with backhaul. Perform and E911 Call testing with engineering SIM card. Use TEMs Phone to perform RX and TX for 611 and 411 call.

Mobile Com: Oklahoma, Arkansas, Kansas _”GR 3”

Task Summary: Install power upgrades of Ericsson RBS 2000 & 3000 cabinets. Run the cables in and out of cabinets. Detailed daily reports of step by step activities performed for every site. Complete all necessary documentation in accordance to the customer’s needs, closeout package. Perform voice and E911 Call test with engineering SIM card. Validate end to end connectivity through backhaul.

Education:
Bachelor of Computer Science and Engineering Dhaka, Bangladesh

Darul Ihsan University

Last Resume Update January 7, 2016
Address Arlington
E-mail lock Locked
Phone Number lock Locked
Resume File Sikander_Khan_Resume.docx 26.7 kB

Contact Candidate

Login or purchase this resume contact details.