Tower Technician 3

·    Fiber Optics, CAT5, Coaxial and Low Voltage Cable

·    Cable Wire Wrapping, Splicing and Termination, Software ·    Quality Customer Service and Customer Relations

·    Installation, Repair and Troubleshooting

·    Rebonding and Grounding Cable and Scheduling

·    LTE/UMTS/GSM Antenna Installation

·    Squid Installation and Fiber Testing

·    Tower and Pole Climbing  

Education

Westport High

Kansas City, MO                                 Diploma Acquired    

Certifications

OSHA 10 & 30, RF Awareness, CPR/First Aid, Rigging 101, AT&T 501, Con-Trained and Electrical  

  Experience

Tower Technician 3 (Mastec Network Solutions)                                                                    December 2013 - Present

·    Install LTE antennas for AT&T with second carrier, install squids, run RF cable including snap-ins

·    Install RRU, cad welded, familiarity with Anritsu Sweep machine and PIM gear

·    Install UMTS/GSM antennas, TMA’s, RET’s, weather proofing and fiber testing

I&R and Cable Splicing Technician (TEK-Systems)                                                               October 2012 - Nov.2013

·    Cable splicing 300 pair cables, rebonded and grounded cables for Century Link

·    Installed & repaired cable drops to homes, replaced all NID Network Interface Devices

·    Climbed poles, connected, rehabbed and pre-filled telephone lines, erected towers, and layed cables

Lead Cutover Technician (R&R Solutions)                                                                                  June 2012 - Aug 2012

·    Connected servers and network equipment, input data via laptop and various tools for JC Penney stores

·    Tested Cisco 2951 Router/Cisco 5525 ASA Firewall and installed Cisco 3560/2960 switches

·    Removed legacy equipment and old Access Points (AP), rack mounted, labeled and moved cables

·    Installed eNodeBs which included power, ground and data cables, frames, and routers for LTE and CDMA

·    Tracked inventory, verified AP (tested & integrated using 3G/4G devices), POS, workstations, quest network, wireless scanners, finemores, price checkers, and time clocks

Level 3 Technician (InterBay Technologies)                                                                         September 2010 – Oct. 2011

·    AT&T Installation in Central Offices(C/O), power cuts at the BDFB, and installed fuse panels

·    Voice Over Internet Protocol (VOIP), installed AC power plugs and receptacles

·    Installed Alcatel-lucent ISAM 7330, 7500, 7750, 45/41 combo equipment and FOT panels

·    Terminated DXS3 cables, secured and fire stopped fiber optic cables, wire wrapped alarms, timed 25 pair cables, worked with low voltage cable

·    CDMA, Lucent products, Nortel networks and stalling BSC, base station controller

Technician (SPX Cooling Technologies)                                                                               January 2009 – June 2010

·    Manufactured cooling towers, operated and repaired electrical machinery

·    Maintained a safe work area, safe work practice and worked within a team environment

·    Ensured efficient time management and produced quality products

Broadband Technician (ICAS Network Services)                                                                    August 2005 – Nov. 2008

·    Supervised and performed scheduled services for broadband cabling

·    Troubleshoot and tested equipment, backbone cabling

·    Demonstrated proficiency with 25, 100, 300 pair cables, cross connects for data, voice, and terminated, installed AC power plugs and receptacles

·    Installed rack systems, cable trays, enclosures, routers and Ethernet hubs

LAN Technician (Watcher Electric and telecommunication)                                            February 2003 – July 2005

·    Read technical drawing and text installer instructions to assemble electronic equipment

·    Terminated fiber optic cables with SC connectors

·    Pulled CAT5 cable to locations, diagnosed and upgraded data & voice lines

Facility Assigner (Spectra Telecommunication)                                                                  April 2000 – October 2002

·    Maintained special circuit files in COPS, changed preferred counts in cables to enable assigning of service orders

·    Kept outside plant informed on defective cable pairs, kept engineering notified of cable fill and measured mileage for special circuits

Cable Installer (American Business Communication)                                                                June 1998 – Feb. 2000

·    Installed, diagnosed and upgraded data & voice line, pulled CAT5 to locations and terminated

·    Terminated fiber optic cables with SC connectors to a 12-port fiber patch panel

·    Read technical drawings, cut and terminated single and multi-strand coaxial cables

·    Stenciled and designated all required markings on racks and cables   *References provided upon request  

Last Resume Update July 3, 2015
Address florissant
E-mail lock Locked
Phone Number lock Locked
Resume File TORRANCE-1973.doc 57 kB
Spanish Speaking? No
Willing to Relocate? No
Years Experience 18 years

Experience

ENDEAVOR TELECOMM
FIELD TECHNICIAN
Jul 2016 - May 2017

INSTALLING SECURITY SYSTEMS AND HOME AUTOMATION FOR ATT

Contact Candidate

Login or purchase this resume contact details.