Project manager
ORGANIZATION
Bechtel Power/Telecommunications AT&T
LOCATION
CITIZENSHIP
American
CONTINUOUS SERVICE
10-08-2000 to June 2008 & Oct 2009 to May 2014
SPOUSE'S NAME
ADA
CHILDREN'S DETAILS
NONE
PROFESSIONAL LICENSES AND SOCIETIES
BA, Major in Management, Master Electrician, in Puerto Rico, License in State of Maine as an Independent Insurance Agent for Life, Health, Property and Casualty.
EDUCATION AND PERSONAL DEVELOPMENT PROGRAMS
Degree, Certificate, etc.
School
Major (or Subject)
Date
Bachelors Degree
Inter-American University of PR, St. Regis Univ. & Ameda University
Business Administration, Major in Management
2002
Associate
Electrical College of San Juan
Electrical Installations and
Design
1978
Associate
Chicago Tech. College
Draftsman 1962
Cert.
Harris Communications
Fiber Optic Installations
1999
Cert.
Phoenix University
Maintenance Management and Staff Development
1980
OTHER SIGNIFICANT INFORMATION
(Examples of relevant information that might be included here)
PERSONAL:
.USAF 4 years Honorable Discharge
Top Secret clearancexxx-xxx-xxxx
LANGUAGES:
English/ Spanish
CAPABILITY:
Fluent/ Fluent
MEMBERSHIPS:
OTHER:
DATES
WORK HISTORY
FROM
TO
COMPANY, DIVISION, DEPARTMENT
LOCATION AND SUPERIOR
POSITION HELD, SUMMARY OF RESPONSIBILITIES AND SIGNIFICANT ACCOMPLISHMENTS
Aug. 2013
May 2014
Bechtel, LTE , Montvale NJ and NYC area For AT&T
Project Manager/Field Coordinator
Co-locating sites, doing design and bid walks, doing web SR’S, supervising GC’S installing pre formed pads and raw concrete pads. Setting Towers, doing electrical installations, fiber backhaul while assuring that construction is done in accordance to drawings and Quality specifications for LTE, UMTS, 1C, 2C, 3C, 4C,5C. While maintaining updates on a daily basis in Market Wiz, ordering Materials, doing punch lists and site acceptance walks
Feb.2013
AUG 2013
Bechtel, New Site Build, San Ramon CA. for AT&T
Project Manager/Field Coordinator
NSB on raw land and Co-locating sites, doing design and bid walks, doing web SR’S, supervising GC’S installing pre formed pads and raw concrete pads. Setting Towers, doing electrical installations, fiber backhaul while assuring that construction is done in accordance to drawings and Quality specifications for LTE, UMTS, 1C, 2C, 3C, 4C,5C. While maintaining updates on a daily basis in Market Wiz, ordering Materials, doing punch lists and CQI’S (site acceptance)
Nov. 2012
Feb. 2013
AT&T LTE Optima project in SAN Ramon CA. Lead, William Baughan
Field Coordinator
Managing GC’S in the field, doing Web MR’S, SR’S and overseeing Quality and safety in the field. Doing CQI’S (Site Acceptance) and turnover packages.
JUL 2011
OCT 2012
Bechtel 4C Project Montvale, NJ. NYC Central Market lead, Eric Mitchel
Field Coordinator
Managing GC’S in the field, doing Web MR’S, SR’S and overseeing Quality and safety in the field and turnover paclages
Oct. 2010
Jul 2011
Bechtel LTE Project Montvale, NJ. NYC Central Market
Field Coordinator
Managing GC’S in the field, doing Web MR’S, SR’S and overseeing Quality in the field.
Oct. 2009
Oct. 2010
Bechtel Cox Communications Project. Rhode Island
Construction Coordinator
New Builds on raw land and Co-locating sites supervising GC’S installing pre formed pads and raw concrete. Doing electrical installations, doing fiber backhaul while assuring that construction is done in accordance to drawings and Quality specifications.
Feb. 2004
June 2008
Montvale, NJ
Lead, Red Beatson
Market Manager, Mike Trampetti
UMTS Project Managing GC’S in the field, doing Web MR’S, SR’S and overseeing Quality in the field.
Apr. 2003
Feb. , 2004
Telecom’s Fairlawn N.J.
Leads, John Wilson, Kurt Brevet
Market MGR. Michael Trampetti
Construction Coordinator- NYC Central Market, (Manhattan) Site surveys C9, Construction on C9 project for Cingular coordinating the installation of Argus Power Plants, MCPA’S, sectorization of existing cell sites, updating drawings and doing close-outs (turnover packages) in a timely manner and being a responsible member of the team.
Apr. 2002
Apr. 2003
Manhattan LSTK 3G Phase 2 in Hackensack. Supervisor John Wilson, Kevin Woodford, Market Lead
Field Coordinator for LSTK for Manhattan 3G Cell sites. Supervising 4 General Contractors on a daily basis to insure construction was done on schedule. Did kit lists and ordered materials, RFI’S, FCR’S. Assured safety procedures were being followed for “0” accidents, did quality assurance, summit progress reports and being part of the team to bring Lump Sum Turnkey to a successful conclusion.
Dec. 2000
Apr. 2002
Hackensack NJ
Leads John Wilson
Jerry Vickers
MM Kevin Woodford
Assigned as a Field coordinator for initial builds for AWS/AT&T GSM technology in Washington State and New York city.
Apr 1999
1991
1968
Apr 2000
1999
1991
Electrical installations for the U. S. ARMY Southern Command for Harris Corp. Puerto Rico
Manati Sales,
Manati , P.R
C.F. Hathaway Co. International Vice President George Silva
Supervisor for electrical installations and Senior Communications Installation Technician responsible for the configuration of electrical installations into highly sensitive equipment cabinets/ rooms in over 35 buildings for the US Army Southern Command in Puerto Rico.
Technical Manager Supervising electrical
installations in Industrial Factories , residential and commercial establishments
Maintenance Superintendent/Plant Engineer, Responsible for Machinery, Plant Maintenance, Electrical Installations, Research and Development For a 700 employee manufacturing plant.
1962
1966
United States Air Force
Missle airframe tech and maintenance chief for Atlas ICBM Missles
Name] [BecRef No.]
Page 4
Last Resume Update | January 16, 2016 |
Address | Boca Raton |
![]() ![]() ![]() | |
Phone Number | ![]() ![]() ![]() |
Resume File | Victor-Giggey-Resume-Wireless.doc 68 kB |