Project manager

ORGANIZATION

Bechtel Power/Telecommunications AT&T

LOCATION

CITIZENSHIP

American

CONTINUOUS SERVICE

10-08-2000 to June 2008 & Oct 2009 to May 2014

SPOUSE'S NAME

ADA

CHILDREN'S DETAILS

NONE

PROFESSIONAL LICENSES AND SOCIETIES
BA, Major in Management, Master Electrician, in Puerto Rico, License in State of Maine as an Independent Insurance Agent for Life, Health, Property and Casualty.

EDUCATION AND PERSONAL DEVELOPMENT PROGRAMS

Degree, Certificate, etc.

School

Major (or Subject)

Date

Bachelors Degree
Inter-American University of PR, St. Regis Univ. & Ameda University

Business Administration, Major in Management

2002
Associate
Electrical College of San Juan
Electrical Installations and
Design
1978
Associate
Chicago Tech. College
Draftsman 1962
Cert.
Harris Communications
Fiber Optic Installations
1999
Cert.
Phoenix University
Maintenance Management and Staff Development
1980

OTHER SIGNIFICANT INFORMATION

(Examples of relevant information that might be included here)

PERSONAL:
.USAF 4 years Honorable Discharge
Top Secret clearancexxx-xxx-xxxx

LANGUAGES:
English/ Spanish
CAPABILITY:
Fluent/ Fluent

MEMBERSHIPS:

OTHER:

DATES

WORK HISTORY

FROM

TO

COMPANY, DIVISION, DEPARTMENT
LOCATION AND SUPERIOR

POSITION HELD, SUMMARY OF RESPONSIBILITIES AND SIGNIFICANT ACCOMPLISHMENTS

Aug. 2013

May 2014
Bechtel, LTE , Montvale NJ and NYC area For AT&T
Project Manager/Field Coordinator

Co-locating sites, doing design and bid walks, doing web SR’S, supervising GC’S installing pre formed pads and raw concrete pads. Setting Towers, doing electrical installations, fiber backhaul while assuring that construction is done in accordance to drawings and Quality specifications for LTE, UMTS, 1C, 2C, 3C, 4C,5C. While maintaining updates on a daily basis in Market Wiz, ordering Materials, doing punch lists and site acceptance walks

Feb.2013

AUG 2013
Bechtel, New Site Build, San Ramon CA. for AT&T
Project Manager/Field Coordinator

NSB on raw land and Co-locating sites, doing design and bid walks, doing web SR’S, supervising GC’S installing pre formed pads and raw concrete pads. Setting Towers, doing electrical installations, fiber backhaul while assuring that construction is done in accordance to drawings and Quality specifications for LTE, UMTS, 1C, 2C, 3C, 4C,5C. While maintaining updates on a daily basis in Market Wiz, ordering Materials, doing punch lists and CQI’S (site acceptance)

Nov. 2012

Feb. 2013
AT&T LTE Optima project in SAN Ramon CA. Lead, William Baughan
Field Coordinator

Managing GC’S in the field, doing Web MR’S, SR’S and overseeing Quality and safety in the field. Doing CQI’S (Site Acceptance) and turnover packages.

JUL 2011

OCT 2012

Bechtel 4C Project Montvale, NJ. NYC Central Market lead, Eric Mitchel

Field Coordinator

Managing GC’S in the field, doing Web MR’S, SR’S and overseeing Quality and safety in the field and turnover paclages

Oct. 2010

Jul 2011

Bechtel LTE Project Montvale, NJ. NYC Central Market

Field Coordinator

Managing GC’S in the field, doing Web MR’S, SR’S and overseeing Quality in the field.

Oct. 2009

Oct. 2010

Bechtel Cox Communications Project. Rhode Island

Construction Coordinator
New Builds on raw land and Co-locating sites supervising GC’S installing pre formed pads and raw concrete. Doing electrical installations, doing fiber backhaul while assuring that construction is done in accordance to drawings and Quality specifications.

Feb. 2004

June 2008

Montvale, NJ
Lead, Red Beatson
Market Manager, Mike Trampetti

UMTS Project Managing GC’S in the field, doing Web MR’S, SR’S and overseeing Quality in the field.
Apr. 2003

Feb. , 2004

Telecom’s Fairlawn N.J.

Leads, John Wilson, Kurt Brevet

Market MGR. Michael Trampetti

Construction Coordinator- NYC Central Market, (Manhattan) Site surveys C9, Construction on C9 project for Cingular coordinating the installation of Argus Power Plants, MCPA’S, sectorization of existing cell sites, updating drawings and doing close-outs (turnover packages) in a timely manner and being a responsible member of the team.

Apr. 2002

Apr. 2003

Manhattan LSTK 3G Phase 2 in Hackensack. Supervisor John Wilson, Kevin Woodford, Market Lead

Field Coordinator for LSTK for Manhattan 3G Cell sites. Supervising 4 General Contractors on a daily basis to insure construction was done on schedule. Did kit lists and ordered materials, RFI’S, FCR’S. Assured safety procedures were being followed for “0” accidents, did quality assurance, summit progress reports and being part of the team to bring Lump Sum Turnkey to a successful conclusion.

Dec. 2000

Apr. 2002

Hackensack NJ

Leads John Wilson

Jerry Vickers

MM Kevin Woodford

Assigned as a Field coordinator for initial builds for AWS/AT&T GSM technology in Washington State and New York city.

Apr 1999

1991

1968

Apr 2000

1999

1991
Electrical installations for the U. S. ARMY Southern Command for Harris Corp. Puerto Rico

Manati Sales,

Manati , P.R

C.F. Hathaway Co. International Vice President George Silva

Supervisor for electrical installations and Senior Communications Installation Technician responsible for the configuration of electrical installations into highly sensitive equipment cabinets/ rooms in over 35 buildings for the US Army Southern Command in Puerto Rico.

Technical Manager Supervising electrical

installations in Industrial Factories , residential and commercial establishments

Maintenance Superintendent/Plant Engineer, Responsible for Machinery, Plant Maintenance, Electrical Installations, Research and Development For a 700 employee manufacturing plant.

1962

1966

United States Air Force

Missle airframe tech and maintenance chief for Atlas ICBM Missles

Name] [BecRef No.]

Page 4

Last Resume Update January 16, 2016
Address Boca Raton
E-mail lock Locked
Phone Number lock Locked
Resume File Victor-Giggey-Resume-Wireless.doc 68 kB

Contact Candidate

Login or purchase this resume contact details.