Objective:

To become an asset to your company utilizing my skills as a

Telecommunication Technician. And to follow out my job with great

Honor and Pride.

 

My experience in the field and trade is 5 years.

Assisted fellow co-workers in planning and execution of job

Assignments.

Demonstrated consistent record of promptness and neatness on the

Job site.

Maintained all the job sites equipment and records of installations.

Contributed to all aspects of company polices and requirements.

Applied knowledge of Telephone, Data and Fiber Optics to

Maintain the company’s communications network.

I made sure the company was satisfied with my work performance.

I have the knowledge of installation code.

Education:

Rogers High School

High School Diploma

Graduated: 2005

 

Job Experience:

(Cabling Solutions)-Owner/Manager/Matt Brown January, 2007-June, 2007

Telecommunication Technician:

Pulled, terminated and tested Cat5e, Coax cable for CCTV Multi-Mode and Single-Mode Fiber Cable

Installed and Grounded Data Racks, Configured Cisco Network Switches with Network Ops.

Terminated Phones to 66Blocks and 110Blocks

Pulled 18 Gauge Wire for PA/Intercom Systems Mounted Ceiling Speakers

Mounted Wireless Access Points

(Black Box Network Services)Steven Newton/Nikki Kohler June, 2007-January-2008

Telecommunication Technician:

Pulled, terminated and tested Cat5e, Coax cable for CCTV, Multi-Mode and Single-Mode Fiber Cable

Installed and Grounded Data Racks, Configured Cisco Network Switches with Network Ops.

Terminated Phones to 66Blocks and 110Blocks

Pulled 18 Gauge Wire for PA/Intercom Systems Mounted Ceiling Speakers

Mounted Wireless Access Points

(Down East Protection Services)Owner/Manager/Tom Vermillion August, 2008-October, 2008

Wireless Technician:

Pulled, terminated and tested Cat5e, Coax cable for CCTV Multi-Mode and Single-Mode Fiber Cable

Installed and Grounded Data Racks. Mounted and Installed Surveillance IP Cameras.

Pulled Access Control Cable for Key Card Access.

Mounted Wireless Access Points

(AAA Security)Staff/Peter Loftus February, 2009-April, 2009

Security Installer

Installed ADT Security Systems for Residential and Commercial

Glass Breaks, Motion Sensors, Window and Door Entrance Jams

(Food-Lion)Manager/David Geer April, 2009-August, 2009

Lead Floor Stocker

(Power-home Technology) Jason Hooko/Installer April, 2010-August, 2010

Telecommunication Technician

Pulled, terminated and tested Cat5e, Coax cable for CCTV Multi-Mode and Single-Mode Fiber Cable

Installed and Grounded Data Racks. Mounted and Installed Surveillance IP Cameras.

Pulled Access Control Cable for Key Card Access.

Installed ADT Security Systems for Residential and Commercial

Glass Breaks, Motion Sensors, Window and Door Entrance Jams

(Armstrong Communications)Owner/Manager Jimmy Armstrong June, 2010-December, 2010

Fiber Optic Technician/Crew Lead

Installed and Grounded Data Racks,

Terminated 25 pair Backbone Phones to 66Blocks and 110Blocks for PBX and Nortel Switches

Pulled 18 Gauge Wire for PA/Intercom Systems Mounted Ceiling Speakers

Pulled, terminated and tested Cat5e, Coax cable for CCTV Multi-Mode and Single-Mode Fiber Cable

Terminated and Pulled Access Control Cable for Key Card Access.

Terminated 144 Fiber Optic Cable for MDF-IDF Closets

Lead a team of four Men.

(Advanced Global Communications)Project Manager Steve Baser April, 2011-December, 2011

Crew Lead

Pulled, terminated and tested Cat5e, Coax cable for CCTV Multi-Mode and Single-Mode Fiber Cable

Installed and Grounded Data Racks. Mounted and Installed Surveillance IP Cameras.

Pulled Access Control Cable for Key Card Access.

Terminated 144 Fiber Optic Cable for MDF-IDF Closets

Terminated 25 pair Backbone to 66Blocks and 110Blocks

Mounted Wireless Access Point

Lead a team of 6 men

(William Stone and Tile) Joe Paroni Lead Fabricator June-2012-Dec-2012

Fabricator/Lead Installer

Cut, Polished and Installed Custom Granite Counter-tops for Six Months

(Tesi Temporary Services) January-2013 August-2013

Cable Technician

Pulled, terminated and tested Cat5e, Coax cable for CCTV Multi-Mode and Single-Mode Fiber Cable

Installed and Grounded Data Racks.

Terminated OSP-Fiber Optic Cable

(Mastec Network Solutions) Shaun Burdick-Project Manager November 2013-June 2014

Cell Tower Antenna Installer/Climber

Pulled power trunk and Fiber Optic Trunks up the Cable Guide. Rigged tower with pulleys/blocks,

Climbed Towers 300’ feet or higher. Used Capstan to hoist equipment up the towers face.

Terminated Power trunk to DC-6 and Terminated Cable at the (Squid) Top of tower.

Snapped in power/fiber trunks down the face of the tower.

Exothermic Welded Grounds for the ice bridge/fiber collection box

Installed Weather tight flex conduits for power/fiber jumpers to and from RRU’s/Squids

References:

Steve Baser:(Project Manager) Advanced Global Communicationsxxx-xxx-xxxx

Todd Price:(Owner)Networking-Conceptsxxx-xxx-xxxx

Trevor Thornton-(Project Manager) Building Systems Technologyxxx-xxx-xxxx

Allen Durrett-(Work Colleague)xxx-xxx-xxxx

Chris Neeley-(Work Colleague)xxx-xxx-xxxx

Shaun Burdick-(Project Manager) Data Cell Systemsxxx-xxx-xxxx

William Keyser-(Foreman) Mastec Network Solutionsxxx-xxx-xxxx

Last Resume Update February 16, 2016
Address Indianapolis
E-mail lock Locked
Phone Number lock Locked
Resume File Andrews-Current-Resume.doc 34.5 kB

Contact Candidate

Login or purchase this resume contact details.