OBJECTIVE
To obtain a position as a Wireless Professional where current skills can be fully utilized an enhanced while allowing for career growth opportunities.
Consumers Electronic Training Center
Basic Electronics and Electricity Certificate, Chicago, IL 1993
EMPLOYMENT
3-2015-Present GOODMAN NETWORKS
DAS INSTALLATION CONSTRUCTION MANAGER/INSTALLATION TEAM LEADER
Managed the installation activities of DAS and Small Cell equipment and associated infrastructure including transport, BTS, DAS, Head-End, civils work, power, outside plant, HVAC and fire-suppression
Performed sweep, OTDR and PIM testing of DAS and Small Cell installations
Performed pre-sales and post-sales installation / construction site surveys
Represented the Field Services Team at on-site customer bids and site walks
Validates Scope of Work (SoW)
Provides on-site management of installation project resources, schedules and budgets
Produces daily reports and work books
Managed inventory needs for the project
On-site customer interface for installation projects
- Lead daily safety briefings and inspections.
- Performed quality audits and inspections.
New construction bid walks
Responds to all trouble calls as requested by customer
Supports network during scheduled integrations
Managed multiple DAS/Small Cell projects within the Midwestern Region
100% project completion below or at budget
Managed DAS Installations for, Energy BBDO Chicago, Omnicom Chicago, Horseshoe Casino Cleveland, South Park Mall Cleveland, Indiana University Health West Hospital Indianapolis IN, ITW Chicago
6-2014-11-2014 CROWN CASTLE INC
NETWORK OPERATIONS TECHNICIAN/ DAS SMALL CELL NETWORKS
Supported and maintained DAS SMALL CELL NETWORKS
Responded to network outages and impairments in a timely and efficient manner
Completed all annual preventative maintenance inspections thoroughly and accurately, to Client standards
Operation and understanding of RF and fiber related test equipment, such as PIM analyzer, Antenna analyzer, RF power meter, Spectrum analyzer, OTDR, Fusion splicer, Optic power meter for troubleshooting and system performance
Operated PC or similar devices to gain access to DAS network and complete assigned administrative tasks.
Worked efficiently and effectively with cross functional departments and peers
Worked independently with minimal guidance, while managing time for maximum efficiency
Managed contactor support during network outages to ensure the restoration of services per Carrier expectations
Monitored networks on a 24/7 basis
Operated 40” boom lift for access to pole and rooftop mounted stealth enclosures
Venue Responsibilities are Notre Dame University, Indiana University, Purdue University, Northern Illinois University, City of Chicago Small Cell and DAS nodes.
10-2013- 6-014 SOLUCOMP PROFESSIONAL SERVICES/VERIZON WIRELESS
SENIOR FIELD INSTALLATION TEAM LEAD/SURVEYOR
Installed ALU 7750 SERVICE AGGREGATION ROUTER-18
Installed INFINITY C DC CONVERTER SYSTEM
Ran Power to various PDU’S including; Lineage Power Plant, Emerson Power Plant, and Netsure Power Distribution Bay
Fiber Duct installation
Fiber and CAT5E cabing
Mounted and stabilized FIF racks
Trained field personnel on all aspects of VZW and Cell Site Standards
Site Power audits to ensure connectivity of equipment
Site Surveys
SAR-18 configuration file and software loads
Material ordering
Completed all administrative tasks and reports
Reports to Director of Network Engineering
4-2013-7-2013 FMHC CORP/US CELLULAR/VERIZON WIRELESS
PROJECT FIELD INSTALLATION TEAM LEAD/CELL SITE TECHNICIAN
Installed and mounted Ericsson 6601EnB LTE expansion rack
Ran power to the existing LTE rack
Ran Fiber and Power to RRU’s
Installed SPD(surge protection device) onto existing telco rack
Installed the Power Distribution Unit(PDU) and Power Supply Unit(PSU) into Power Supply shelf
Terminated Power into the Power Distribution Bay(PDB)
Installed Cable Management Trays
RayCap Power Distribution Panel Installation
Installed Fiber into 7705 Cisco Router with Cisco SFP
Installed Ericsson DUS Network Card
Integrated Ericsson DUS for AWS LTE expansion
Installed SPD(surge protection device)Shelf Unit
Completed Closeout Packages
Integrated DUS Network card
10-2012 - 2-2013 BLUESTREAM/VERIZON WIRELESS
LEAD FIELD INSTALLATION TECHNICIAN
Installed Ericcson 6201 EnB cabinet
Installed RF cabling from diplexer to EnB cabinet
Terminated PPC connectors
Pim and Sweep testing on RF cabling
Installed GPS Antenna and GPS OVP
Ran Battery and Return Cables for power to the EnB into the Lorain and Marconi Power Plants
Ran and Terminated fiber cable from the EnB to the 7705 Cisco router
Completed all administrative tasks and reports using MS EXCEL spreadsheet
Completed Close out Packages
5-2012- 7-2012 GLOTEL INC./ BLACK & VEATCH/SPRINT INC.
FIELD SERVICES TECHNICIAN
Alarm testing and troubleshooting on the, Samsung MMBS Primary and Battery Cabinet for the Sprint 3G and 4G network
RF Drive testing
Fiber installation and testing
3g call testing per sector
T1/UDA testing
4G Data and upload/download speed testing
Programmed 4G UAMA for Sprint
Added ENV files per 4G site
Proficient with XSHELL, and PROCOMM software
Analyzed data to ensure cell site integrity
Completed all administrative tasks and reports using MS EXCEL spreadsheet
6-2011 – 3-2012 ERICSSON INC./AT&T/USCELLULAR/METRO PCS
ASSOCIATE ENGINEERING TECHNICIAN
Performed CDMA, EVDO, and LTE 4G upgrades and expansions
Downloaded LTE 4G site calibration data for AT&T network
Accessed and modified BTS databases on Metro PCS wireless CDMA networks
Installed LTE 4G Equipment and RF cabling
Installed CDMA Equipment for Metro PCS network
Convert/upgrade Carriers on existing BTS and RBS systems to accommodate future data capabilities
Performed hardware additions, carrier adds, carrier swaps, carrier upgrades and adds as deemed necessary by the RF Performance group
Performed complete call functionality test to ensure the cell sites integrity for all sectors
Managed and supervised cell tower crews during RBS alarm troubleshooting
Installed power to Argus bay for carrier service equipment
Volt/Ohm meter used to both measure cell site AC/DC voltages and measure cable resistance using the Ohms setting
Performed stitching and lacing onto cable routing racks
Completed all administrative reports and tasks
1900 and 800 frequency call testing
Installed Ericcson 6601, 6201
3-2008 - 9-2010 AT&T/ GARY, IN
PREMISE INSTALLATION AND REPAIR TECHNICIAN
Configured IP based equipment and services
Coupled service lines at premises and at outside plant cross-boxes and serving terminals.
(Aerial and buried)
Wireless Internet and IP setup, VOIP configuration
Interfaced and connected all services to digital, wireless modems
Installed DSL service from central office to customer premise
Connected Fiber Optic Network Interface service devices
Terminated voice/data telephone jacks
Installed cat5e cabling
66 and 110 block terminations
Proficient with Windows 7, XP, Vista, and Windows 2000 operating systems
Working knowledge of IP DSLAM systems
Maintained working relationships with customers and clients
Accurately completed administrative tasks and reports
Assembled RJ11 and RJ45 ends for Ethernet and voice cables
1-2004 - 1-2006 I.B.E.W. LOCAL UNION # 136 / BIRMINGHAM, AL
ELECTRICIAN
Power plant maintenance during scheduled outages
Mounted 3 phase motors and controls
Setup electrical equipment including, transformers, timers, lighting systems and generators
Terminated high and low voltage circuitry
Analyzed and interpreted building prints and schematics
10-2004 - 5-2005 INLINE VOICE, DATA, AND NETWORKING / BIRMINGHAM, AL
CABLING TECHNICIAN
Installed cat5, 5e and cat6 plenum and non plenum cabling
Setup D-Link wireless Internet and routers
Tested and certified all data lines upon completion with T-Berd test meter
Constructed equipment racks and cable trays
Terminated voice, data jacks
Assembled RJ 11 and RJ 45 ends for Ethernet and telephone cables
Installed telephone network routers, hubs and switches
Attached D-Marc extensions
Installed Routers
RELATED SKILLS SUMMARY
Efficient with, RJ45, RJ11
Ability to interpret schematics, tech manuals, and building prints for placement of equipment
Certified VOIP professional
Certified Fiber Optics Technician #2083904
Certified Fiber Splicing Technician #2083904
Certified aerial and buried telephone lineman
Certified RBS(Radio Base Station) Builder
Certified Nokia Siemens Network Commissioning and Integration Technician(FLEXI)
Certified Nokia Siemens Network Builder
OSHA 1O Hour Certification
CPR AND FIRST AID Certification
Ericsson RBS LTE Commissioning Certification
Ericsson Installation Level 3 Certification
RF Awareness Certification
Certified Tyco Electronics Technician
Certified Commscope Technician
DOT Certified
REFERENCES ARE AVAILABLE UPON REQUEST
| Last Resume Update | February 22, 2016 |
| Address | Homewood |
Locked | |
| Phone Number | Locked |
| Resume File | darris-triplett1-RESUME-word-doc.docx 28.07 kB |

Locked