foreman/CM

Knowledgeable in coax, high and low voltage wire installations
OSHA 10 Certification ,RF Awareness, Commscope, Bechtel Passport, Manlift Certification
Comtrain, confined space cert, Anritsu/PIM Experience, First Aid/CPR
Knowledge of D/C power
Fiber install and fiber testing
construction management experience manage up to 4 crews
below budget and manage sites under budget
Experience
11/14-12-14
Foreman- tricom networks
•inventory materials for up coming sites
•order materials, set up sites, scheduling,
•25/64 radio swaps for sprint
•pick up sites from customers
•schedule crew for next day
8/14-9/14
Foreman.. Dtreds
• over see daily projects for AT&T BUILD
•SWEEP AND PIM SITES, ANTENNAS, LINES.
•daily reports, contact with customers on daily basis
•manage crew on safety, daily meeting
• trouble shooting issues on site
11/13- 6/14
FOREMAN
Bluestream Pro Services
Tiger team/trouble shoot sites
Run multiple crews with no/or limited supervising
Communicate with CM/RM on a daily basis
Close out packages
End of day daily reports to CM/RM
Able to order own material as needed for truck and site
Communicate with AT@T representatives
Communicate with AT@T techs
Install and Decomm equipment
Read CD’S,RFDS,
Walk sites and red line drawings
07/13- 09/13
Bechtel/Beacon
Install ATT equipment on cell sites new upgrades to 4G Monopoles and
rooftops Becon passport cert ,safety cert. UMTS overlay and co-location, run coax, sweep test sites, PIM test, build and install waveguide ladder, install antennas with TMA's. Run jumpers in shelter. Troubleshoot and maintain antenna systems. Install ret system and program CCU. 4G-Install fiber cable, testing, putting up squids, Installing RRU’s, L and A work.
12/12-06/13
3S Communications Lead Tech
New builds for TMO projects set up crews to start new builds Inventory on equipment contact with Ericsson cm for updates: Power upgrade and Cut over’s from receiving the boom to completion. DUG replacements Power upgrade DUW30 scripts Cut over’s/ Integration & LMU. Close Out Packages Pre & Post Sweeps UMTS/AWS/PCS/LTE MOP’S performed T-Mobile 4A Outdoor& indoor GSM Cabinet Rip and Replace with RBS 6102 Macro, T-Mobile 4A Indoor GSM Cabinet Rip and Replace with RBS 3200 to 6231 Macro, T-Mobile 3B Outdoor RBS 3106 with 6131 Power Upgrade and RRUS, T-Mobile 3B Outdoor RBS 3106 with PBC 05 and RRUS TMO RBS6131 Power Upgrade with 5 PSU ,T-Mobile PBC 6500 Power Cabinet Upgrade T-Mobile Generic RBS3106 CBU upgrade to DUW Install-Mobile PBC 6500 Power Cabinet Upgrade T-Mobile RBS 6102 Hybrid Power Upgrade.
10/11-12/12 NTVI Communications
Tower hand for sprint ALU projects New builds wiring RRU's install antennas closeout packets: I performed M1 and T1 Migrations day and night. I performed cut overs cleared alarms and lite Commissioning on Cisco ASR 901. I worked from detailed mops on 4g and 3g CMDATechnology. I also worked on a tiger team clearing alarms, pulling and replacing old and faulty equipment on sprint network. I also worked on-call 24/7 troubleshooting and clearing alarms once a month for a week in Oakland, CA. to San Ramon, CA. I also worked with tower crews as support in an effort to clear major alarms such as RET_COMM_, VSWR_ fail etc. in a timely and efficient manner.
05/10-09/11
Next link
QA inspector/tiger team for ALU sprint projects
Trouble shoot diversity problems
Maintained GSM and UMTS systems, Sweep test antenna systems, Replaced diplexer and MHA's Troubleshoot and repair tower light systems, Troubleshoot fault in chain and diversity alarms in Nokia GSM equipment. Install UMTS equipment, assemble RF jumpers, Plan and execute projects in a timely manner with safety on the front line, with the respect of 100% tie off.
Maintain Microwave systems and path alignment. Install and test t1’s from NIU to equipment with NOC, perform expansions for UMTS and GSM.
Construct UMTS sites, build and install antennas, run coax, build and install antenna booms, Troubleshoot and maintain cell sites. Install LTE equipment, install ret systemInstall BTS equipment.
De-commission cell sites, Disaster Relief, Co-locations of cells sites, build forms and pour concrete for equipment, run conduit and pull electrical. Drive ground rods and cad weld ground ring.
Top push, running lines, antennas, hanging booms. Maintenance, troubleshooting, cutovers, and decom.
Tower Technician/Equipment Operator
09/2008-04/2010 Herca Telecomm, Perris, CA
Operated a low bed truck, excavator, backhoe, bobcat and loader
Installed cell towers
Installed coax, low and high voltage wires
Set azimuth on antennas, Constructed low profile platforms on monopoles, Installed coax and terminated connectors, Assembled ice bridge and trapeze, Mounted antennas and LNA's, Assembled and mounted boom gates, Responsible for picking up and delivering materials to site, Constructed
Install fire alarm panels, terminate alarm circuits. Troubleshoot alarms circuits. Install
audible and signal devices
Education Jurupa Valley High School, Mira Loma, CA
1995 - 1999
Diploma
References

Last Resume Update December 29, 2014
Address riverside, California
E-mail lock Locked
Phone Number lock Locked
Resume File Resume-11.docx 14.28 kB
Spanish Speaking? No
Willing to Relocate? No
Years Experience 7yrs

Contact Candidate

Login or purchase this resume contact details.